These sections will be closed for construction!

Announcement on the closure construction of Yuhe bridge on Shengli Street, Xueyuan street and Dongfeng Street according to the construction requirements of Weifang Yuhe river basin drainage main channel reconstruction project, two traffic lanes on the north side will be occupied for semi closed construction in the west of Yuhe bridge on Shengli Street, one traffic lane on the south side will be occupied for semi closed construction in the East and west of Yuhe bridge on Xueyuan street, and one traffic lane on the north and south sides will be occupied for semi closed construction in the west of Yuhe bridge on Dongfeng Street.

All enterprises, institutions and residents along the line are requested to make preparations for production and life in advance and pay attention to traffic safety according to this announcement.

3 The length of the semi closed section on the south side of the west bridgehead of Yuhe bridge on Dongfeng Street is 6m, and the length of the semi closed section on the north side is 7m.

During the closed construction period, vehicles, pedestrians and non motor vehicles passing through this section shall bypass the road outside the enclosure.

closed road section 1 The semi closed section at the west bridgehead of Yuhe bridge on Shengli Street is 12m long.

2 The semi closed section at the west bridgehead of Yuhe bridge on Xueyuan street is 14m long, and the semi closed section at the east bridgehead is 20m long.

Closure time closure construction time: March 31, 2022 to April 19, 2022.

II.

It is hereby announced that the traffic police detachment of Weifang Public Security Bureau Weifang Municipal Public Utilities Service Center on March 25, 2022 related link: from March 27, these sections will be closed for construction! Click the business card below to pay attention to the “Weifang financial media” Weifang financial media (wechat: wfnews001) editor production editor: Fu Ning news clue: 0536-8196500 recommended reading in previous periods ▲ the track of two new asymptomatic infections in our city was announced ▲ the epidemic situation of novel coronavirus pneumonia in Weifang ▲ warm heart! Weifang provident fund new measures..

Please understand and support the inconvenience caused by the road closure construction.

In order to ensure road traffic safety during the construction period, relevant matters are hereby announced as follows: I.

Flat End Socket