be careful! This intersection will be closed for construction!

To Wujiang ➡️ 4.

South to North (into Pearl City) ➡️ 2.

The non motor vehicles and pedestrians passing through the intersection in the north-south direction should pass through the built pedestrian passage: the non motor vehicles should get off the bus to promote! “Suzhou Wujiang release” government affairs micro matrix release source: Wujiang traffic police editor: Gu Xinyue reviewed by: Liuliping..

Please strictly follow the signal lights.

please drive into Jingui Avenue and enter from the east gate of the community.

The accessible roads are as follows: Figure 1 construction area and motor vehicle bypass plan (near end).

New signal lights are added at the Jingui Avenue on the east side of the intersection and the viaduct on the west side.

To Wuzhong ➡️ 3.

after the original South left turn vehicle turns left, please drive west through the viaduct hole; You can also choose to bypass the S230 provincial highway through the West extension of Lize road.

It is suggested that during the construction period, in order to alleviate traffic congestion, a one-way street from south to north of Jingui Avenue will be opened, a one-way street from north to south of East Taihu levee will be opened during the morning peak hours, and a one-way street from north to south of wangongdi will be opened during the evening peak hours, It is recommended that the vehicles bypass according to the following scheme: North to South (out of the Pearl City) ➡️ 1.

Figure 2 Schematic diagram of motor vehicles’ detour during construction (far end) special reminder ‹ the construction diversion and reconstruction will have a great impact on vehicles entering and leaving the Pearl City community.

Magnetic Steel Chamfer

for the original northbound and left turning vehicles, please turn right first, and then turn right or go straight after bypassing the construction area; The original left turning vehicles can also bypass through Bixiang North Road.

Closed from April 12 to August 12, 2022.

In the diversion and reconstruction plan, the intersection of Jiangling West Road and Zhongying Avenue (the intersection of Pearl City) will be partially closed.

Vehicles entering and leaving the community should detour at the new intersection on the East and west sides of Jiangling West Road – Zhongying Avenue intersection.

vehicles turning left from the original East should continue to go straight, bypass the construction area and then drive into Zhongying Avenue; You can also detour through Bixiang North Road.

Due to the construction needs of Jiangling road rapid transformation phase I project, the intersection of Jiangling West Road and Zhongying Avenue will be closed from April 12, 2022.