be careful! For 21 days, Taiyuan belt expressway has been constructed

Drivers of motor vehicles passing this section at the above time shall pay attention to the road signs, slow down in advance, maintain a safe distance, obey the command of on-site staff, and pass in an orderly and safe manner.

K72+ 895-k73+034 (south to North) 5.

On June 8, the reporter learned from the No.

K83+840-k83+880 (south to North) 7.

K84+700-k84+750 (north to South) 6.

1 traffic police detachment of Shanxi expressway that the pavement restorative maintenance construction of the northwest ring section of Taiyuan ring expressway will be carried out from June 10 to 30.

The specific information is as follows: safety tips for pavement restorative maintenance construction of the northwest ring section of the belt expressway: the whole line of the northwest ring section of the Taiyuan belt Expressway (Taiyuan belt Expressway g2003k44-k88) under the jurisdiction of the fourth brigade of the first traffic police detachment of Shanxi expressway is expected to carry out multi-point pavement restorative maintenance construction from 06:00 to 18:00 every day from the 10th to the 30th of this month.

Erection Anchor

During the construction period, one traffic lane will be closed alternately.

Alarm service telephone number of the fourth brigade of the first expressway detachment: 0351-6775742 details of the construction points and sections of pavement restorative maintenance works in the northwest ring section of Taiyuan ring expressway: 1.

K52+620-k52+670 (south to North) 2.

K44+500-k44+600 (north to South)8 K52+600-k52+800 (south to North) 9, k49+970-k50+400 (north to South) 10, k53+310-k53+350 (north to South) 11, k57+800-k58+039 (north to South) 12, k61+700-k61+750 (north to South) 13, k73+000-k73+040 (north to South) 14, k80+000-k80+050 (north to South) 15, k84+ 350-k84+700 (north to South) 16, k86+450-k86+500 (north to South) the first expressway detachment of the traffic police corps of the Public Security Department of Shanxi Province June 8, 2022, the fourth brigade..

K61+559-k61+609 (south to North) 3.

K61+697-k61+747 (south to North) 4.

To ensure the safety of construction and passing vehicles, one carriageway will be closed alternately during construction.