2 after brushing the dye twice, wait for the ground to dry and allow the dye to fully penetrate the ground.
2.
3 clean the sewage on the ground with a water absorber after grinding.
4 after the material fully reacts with the ground (the reaction time is usually 6-8 hours); Change the 500 mesh grinding disc and continue to polish the ground.
After the 1000 mesh resin grinding disc is used for dry grinding, the color of the ground may be inconsistent.
3 after the dyed ground is completely dry, use 1000 mesh resin grinding disc to dry grind the ground to remove impurities on the dyed ground surface.
After the completion of the above processes, people can be on board 24 hours later, and they can be delivered for use 48 hours later.
4.
During the drying process of the ground, impurities will appear on the surface of the dye and the color will darken.
It is applicable to the underground garage floor, industrial plant floor, logistics warehouse floor, indoor and outdoor industrial floor, large shopping mall and supermarket floor, food factory and pharmaceutical factory floor, electronic communication workshop floor, floor ash and sand removal treatment, old floor renovation, and low cement floor hardness.
Adopt high-speed polishing machine equipped with cleaning pad to conduct solid color polishing on the ground.
After re brushing the dye, wait for the ground to dry.
Ground grinding: the first course of base surface grinding (water grinding): the base surface is polished with a 100 mesh grinding disc and a professional ground grinder; The second course of base surface grinding (water grinding): the base surface is polished with 150 mesh grinding disc and a professional ground grinder; The third course of base surface grinding (water grinding): the base surface is polished with a 300 mesh grinding disc and a floor grinder.
The dye sealing and curing agent is the same as the primary color sealing and curing agent.
Try to avoid secondary pollution in the process of drying, so as not to affect the dyeing effect in the next dyeing process.
3 ► ground fixation treatment 1 after the ground dye is completely dried, spray the ground with the color fixative in a water spray kettle at the dosage of 0.1-0.2 kg / m2.
Different colors are prepared according to the needs of customers, Meet the diversified needs of customers.
2.
The dye floor is rich in color, which can be mixed with the needs of customers to meet the diversified needs of customers.
How is it applied? 1 ► foundation ground treatment 1 new cement ground curing for two weeks / terrazzo curing for 7-10 days, clean up the dirt on the concrete ground (such as cement slag, paint blocks, garbage, dust, etc.).
►►► dye curing agent flooring dye concrete sealing curing agent flooring can permanently improve the strength and hardness, permanently seal, impermeability, permanently cure the concrete, permanently do not produce dust, super bonding ability, save a lot of maintenance and repair costs, and can make floors of various colors, which is more beautiful than the original color.
Statement: the content of this article comes from the Internet,.
When the ground is more than 80% dry, the concrete sealing curing agent can be applied.
2 ► ground dyeing treatment 1 after the first coat of dye is applied, the ground will dry quickly due to uneven absorption of dye by the concrete.
When painting the dye for the second time, it is necessary to increase the application amount and the application area at the faster drying part.
►►► floor dye has so many advantages.
Keep the ground dry after polishing; During construction in the basement or in autumn and winter, the ground shall be dried for more than 12 hours.
At this time, it is necessary to brush a small amount of dye at the place with light color to ensure that the dye on the ground is uniform and the surface color is not different.
After the ground is fixed and polished, clean the ground to keep it clean.
Spray the product on the ground with an amount of about 0.3KG / ㎡, push it evenly with dust, and let the curing agent penetrate into the concrete as much as possible.
This part of the ground needs to be coated with dye for the second time.
In the construction environment with poor ventilation effect, a blower shall be used to dry the ground.