BIM based cost accounting is fast, accurate and analytical.
Realize continuous optimization of construction methods, and realize zero conflict and zero rework in actual construction.
By combining the construction progress with the three-dimensional model, the construction progress is simulated according to the time sequence through the visual environment.
3.
Source: Zhulong BIM.
4.
the most accurate basic engineering data can be obtained through BIM to effectively control the construction cost and improve the project management level and cost control ability.
It has great advantages in dealing with actual engineering cost accounting.
6.
If there is any infringement, please contact the deletion statement: this wechat.
monitor the construction process in real time, and conduct budget, cost dynamic calculation and real-time query and analysis for different nodes.
The powerful statistical analysis ability can easily meet various cost analysis needs.
in the construction process.
The overall management of the whole life cycle of the project is insufficient, which makes the value of BIM Technology insufficient.
3.
2.
24D construction simulation 1 Construction 4D simulation is an important application of b1m technology in the construction stage.
based on the informatization models of architecture, structure, HVAC, water supply and drainage and electrical disciplines, integrate the professional models to form a complete building model, and then import them into computer analysis tools to detect collision and generate reports.
4.
Nowadays, in China’s domestic construction market, the application of BIM Technology in the design stage is relatively mature, while the application in the construction stage is only in its infancy.
according to the actual construction environment data, carry out repeated simulation of construction sequence and construction process, correct deviation, collision detection, reasonable investment of construction resources, eliminate potential safety hazards, improve insufficient working space and other problems, and adjust the construction scheme in advance.
multi discipline collaboration platform, based on the same database, modify in one place and modify as a whole.
the most direct role is to find out the problems existing in the design, such as the collision between HVAC, water supply and drainage and the structure, so as to effectively reduce changes and rework.
Today, we will discuss the specific application and great value of BIM Technology in the construction stage.
it can realize the dynamic control of capital investment and resource allocation during the construction process.
BIM Technology realizes the dynamic maintenance of cost data, and the accuracy is getting higher and higher; Based on the powerful database, the ability of analysis and summary is also greatly strengthened, playing an irreplaceable advantage in project construction management and enterprise cost control.
5.
the information model integrates many information such as materials, sites, mechanical equipment, personnel and even weather conditions, and simulates the construction progress of the construction project in days.
2.
through 4D construction progress simulation, it can visually reflect various construction processes, facilitate the coordination of the construction sequence of each discipline, organize professional teams to enter the site for construction in advance, prepare equipment, revolving materials, etc., realize the information, visual and integrated management of the construction site, construction process and some complex construction procedures, and realize the dynamic control of labor, material resources, costs, etc.
35d cost control 1 The 5D cost information model is constructed by adding cost elements to the 4D building information model.
3.
Optimize the construction scheme in time.
5.
13D collision detection 1 Collision detection includes physical collision and rule collision.
2.
4.4d the simulation of construction progress is highly intuitive.
establish the 5D cost information model relational database, so that the actual cost data can enter the 5D relational database in time.