How to manage engineering construction? What should engineering management do?

At the same time, it is also necessary to do a good job in the organization of process flow and the allocation and organization of all personnel, materials, machinery and other materials entering the construction site.

Short Waved Anchor

There is no trivial matter.

On the premise of ensuring quality and safety, we should not rush the construction period at the expense of quality and safety.

Careful consideration should be made as far as possible to ensure the safety of construction personnel, construction materials and construction machinery, and minimize the occurrence of accidents.

Cost control: minimize the cost under the premise of ensuring the construction period and quality.

Three controls, three management and one coordination, safety management is the most important, and safety is the top priority, which should be remembered at all times.

The use of labor, materials and machinery should be strictly controlled, and the work that can be done by one person should not be used for one and a half; Materials shall be cut accurately to avoid waste; Before using large machinery, we should make preparations.

Information management: before, during and after construction, a large amount of data information and records of various achievements will be generated.

Construction period control: each project has a construction period agreed in advance, and efforts should be made to complete the contract within the construction period.

Both the personnel of the unit and external personnel entering the construction site should take measures to ensure their health.

The environment is the foundation of our survival.

We have all heard of project management more or less, or many people have had relevant experience and experience, and some of them are new to the industry of engineering, and their eyes are dark.

So how to manage the project? What should engineering management do? There are seven tasks in project management, including three control tasks: quality, construction period and cost; Three management tasks: safety, occupational health and environmental protection, and information; The last task is organization and coordination.

Occupational health and environmental protection management: it is also important to pay attention to the occupational health of personnel in the project at all times.

It is necessary to collect and manage them by categories, and there should be complete records and archives for everything, which is also an important part of the project.

QQ group 925078799, password? Sesame open the door, qq2300665262 add group ~ ~ recommended reading ~ ~ manually calculate the reinforcement formula, the most stupid stair design in the history, it is difficult to die! What is engineering valuation? What should we pay attention to in learning cost? Four skills to skillfully control the cost of engineering supervision enterprises..

Of course, the construction period is not as early as possible.

Organization and coordination: any project should have a supporting organization, which determines whether the project is completed or not.

Otherwise, huge human and material resources will be invested, and the final product will be an unqualified product, which can not be used and will also cause great economic losses.

Otherwise, the profit is not enough to lose.

Safety management: safety is the most important work in engineering construction.

We prefer materials and other machinery rather than machinery and other materials.

During construction, we should try not to damage the surrounding environment and protect it.

The coordination work should do a good job in internal and external coordination to ensure the orderly progress of the project.

Quality control: any project needs to take quality assurance as the fundamental requirement, and qualified quality is the most basic requirement.