How many steps are there from the constructor to the president?

1.

Knowing the details of each process and being familiar with all collaborative links can prevent more problems that appear at the back end in the front end, so as to avoid risks and eliminate the problems in the budding cases: to pre control, at least 3 months in advance.

There are many problems between Party A and Party B in coordinating each connection.

Each of them acted in its own way.

3.

When I was the engineering director of a large project, I was responsible for the second bid section project, and another colleague was responsible for the first bid section.

In order to promote the municipal pipe network project, you can even disconnect the road into the building.

Case: look for common goals with empathy.

If you want to stand up in the changes of the industry, maybe every real estate owner should ask himself: how can we draw each stroke well? How to deliver each work? 01 advantages of construction workers.

To get through horizontally, learn that the starting point is the same, and the acceleration that opens the gap between people can even make you catch up when the starting point is different.

Da Vinci measured the Italian town with his feet and drew Imola’s map with his bare hands.

The delivery time of the first bid section is tight, because I am a construction enterprise, and I know the procedures and links of the delivery.

Party A’s management personnel with the perspective of Party A and Party B will have a clearer and more realistic judgment on the project problems, which will help the project management.

Every morning, before the workers go to work, I have already set out the line, and began to learn the key points of steel bar binding and other processes from the teachers on site.

I will coordinate other things and fully support you; Finally, in the case that everyone believes that it is likely that we will not be able to deliver the building, we completed the delivery ahead of schedule and successfully completed the task.

I told the engineer outside the pipe room that no one can block you.

I remember when I was working on the general project, there was a project delivery stage.

At that time, I went to the construction site at 7 a.m.

2.

Bad projects have their own disadvantages, but good projects have a common advantage, that is, “fewer pits and fewer mines”.

I know that the distribution room is an important part of the delivery of the building.

They can neither beat their heads by themselves, nor rely solely on the reported information, but make decisions based on facts.

Party A’s managers need evidence to make decisions.

Case: when I went to the construction site instead of just listening to the report, I was the person in charge of a project of more than 1600 mu.

For a long time, some teachers even came to ask me about the connection of processes.

Therefore, we should have pre control over any work and think about things in three months.

For every real estate owner, every process of construction, such as every sum in Leonardo da Vinci’s hand, every house delivered to the owner should be full of beautiful works of art.

In this way, when the house is delivered to the owner, I can say with confidence: this house is my work.

From the constructor to Party A, I obviously found that we not only understand Party A’s needs, but also understand Party B’s thinking.

The accuracy of the map is calibrated by satellite today, and Da Vinci’s paintings are all right.

I also came out of the construction enterprise.

When the engineering manager arrived at the construction site at 8 o’clock and learned that I had just returned from the patrol, the report was also the most true.

Case: the story of learning: after graduation, I made a five-year plan for the examination, completed the intermediate engineer rating within three years, and completed the senior engineer rating and the first-class constructor examination within five years.

4.

Click on the blue words above to pay attention to our 1503, when Leonardo da Vinci was trapped in a small town called Imola due to war.

The complete experience of construction makes me have the working thinking of looking at the whole from the part and looking at the part from the whole.

A good construction worker who understands technology and knows every process must first be a good technician and know every process well.

three times a week.

Lifting Loop

Only after the successful delivery of the first bid section finally did I know that the power distribution room was completed by me.

I understood their pain points, and when I was involved in coordination, I could better grasp the key points and lay out the work rhythmically.

I remember the parameters and models of theodolite and total station used for setting out at that time.

I first inspected the whole project in a week to master the most real situation on the construction site.

Be good at prevention and eliminate problems in the embryonic stage.

After knowing this situation, I took the initiative to put down the progress of other buildings and try my best to do a good job in the construction of the distribution room.

I’m on the spot during the day, doing office work at night, and I’m studying after others get off work..

02 construction workers are just technical houses? 1.

At that time, the distribution room of the first bid section was set in the second bid section under my jurisdiction.

In fact, it is because of poor communication, mutual understanding and lack of empathy.

This advantage can help Party A and Party B to work together efficiently, and collaboration means the smooth operation of the project.

The key to the success of “beating hamsters” is actually to eliminate every loophole that hamsters can expose in advance.

Being able to manage, making decisions based on facts rather than reports and seeking truth from facts is the simplest essence of management, but it is also the easiest to be ignored.

The time was very tight, and the participating units quarreled endlessly because of the problems of the working face.

I am very clear.

Although it is only a surveying and mapping work, Da Vinci used color and light to make this map both scientific and artistic.

When I was a construction worker, I was obsessed with technology, so I will study every process carefully, whether it is setting out measurement or binding masonry, I want to study it thoroughly.

First, unify our thinking, promote the general contracting management mode, and let “the general contractor manage the subcontracting”; Second, focus on the main contradiction, and the working face on the key line must be reserved.

He walked in the street every day, constantly adding and subtracting.

I realize that only by combining theory with practice can I improve my technical level.

The important thing is how to make work deployment in combination with the actual situation on site, how to coordinate the current difficulties, so as to make the most correct decision.

If you can’t know every process under the wall, how about quality management? For refined management, Party A should understand Party B’s thinking and technology, and Party B should also understand Party A’s management and needs.

Empathy.

Slowly, I became a technical “expert” in the project.