If you want to join the group chat, please.
During the construction period, the freight vehicles (with a verified load of 1 ton or more) that need to enter the urban area of Wuhu through the Third Yangtze River Bridge of Wuhu should apply for the “cross river pass of the Third Yangtze River Bridge”, and pass through the front line of “Erba hub of Wuhu Hefei Expressway Tongjiang Avenue Hangzhou Road Wuyue road Yangtze River Third Bridge Middle Jiuhua Road Wanchun road” according to the designated route.
During the construction period, in order to improve the traffic efficiency and save the traffic time, the transit vehicles from Hefei to Wuhu should plan the driving route in advance, and bypass the maxi hub of Hefei Wuhu Expressway to Ma’anshan Yangtze River Bridge and Wuhu Second Yangtze River Bridge; Vehicles from Wuhu to Hefei pass normally.
Wuhu Yangtze River Bridge Highway Bridge (first bridge) will start half closed construction at 16:00 on July 15.
For more travel information, please pay attention to Wuhu bus fans ยท Wuhu Youxing Weibo (WPT Wuhu Youxing – Wuhu Travel Service), wechat subscription number, headline number and Tiktok number.
It is forbidden to pass during the morning peak (7:00-9:00) and evening peak (17:00-19:00).
Three wheel electric vehicles in special industries involving public interests such as people’s livelihood security should be filed with the public security traffic management department, and pass in accordance with the non motor vehicle traffic rules after obtaining a pass.
During the construction period, non motorized vehicles are forbidden to drive into the Yangtze River Bridge, and the special passage of the Third Yangtze River bridge or ferry will be used to cross the river; The upper and lower bridge points of the special passage of the Third Yangtze River Bridge are at the North toll station of the Third Yangtze River Bridge and Yinhu road in the urban area respectively.
Wuhu youhang brings you the latest information about transportation every day.
Please obey the command of the traffic police and drive in strict accordance with traffic signs and markings to ensure traffic safety.
Traffic police remind: in case of temporary traffic organization during construction, relevant traffic measures will be adjusted in time.
New energy trucks do not need to apply for a pass.
Click on the business card below to pay attention to Wuhu bus fans.