Office decoration project construction contract 2022 Edition

3.

10.3 the construction period will not be postponed due to Party B’s failure to complete the project on schedule; If there are problems in the project quality caused by Party B, the rework cost shall be borne by Party B, and the construction period shall not be postponed.

If it is necessary to dismantle the non load-bearing structure or equipment pipeline of the original building, be responsible for going through the corresponding approval procedures with the relevant departments.

7.3 protect the furniture and furnishings in the original room and ensure the smoothness of the water supply and drainage pipes in the room.

Force majeure.

6.2 provide water source and power supply to the construction site during construction.

2.

Article 8 project change 8.1 if the project content or construction method needs to be changed, both parties shall reach an agreement through consultation, sign in writing for approval, and adjust the relevant project costs and construction period at the same time.

6.6 participate in the supervision of project quality and construction progress, and be responsible for materials and completion acceptance.

Article 10 construction period delay 10.1 if the completion date is delayed due to the following reasons, the construction period shall be postponed accordingly after confirmation by Party A: 1.

10.2 if the construction period is affected by Party A’s failure to complete the work in its charge as agreed in the contract, the construction period shall be postponed; If the project quality is affected by the unqualified materials and equipment provided by Party A, the rework cost shall be borne by Party A, and the construction period shall be postponed accordingly.

Sign after acceptance and fill in the project warranty form (see Annex I: project warranty form).

Article 9 material supply 9.1 for the materials and equipment provided by Party A according to the contract, Party A shall notify Party B before the materials arrive at the construction site, and both parties shall jointly accept and handle the handover procedures.

Article 12 project acceptance and warranty 12.1 both parties agree to accept the project quality in the following stages during the construction process: 1.

6.3 be responsible for coordinating the relationship between the construction team and the neighborhood.

Article 3 contract price 3.1 contract price: the lump sum price of the contract (RMB) ¥.

Changes in quantities or design changes.

6.5 coordinate with relevant departments to do a good job in security, fire protection and garbage disposal at the construction site.

2.

After the completion of the project, Party B shall notify Party A of acceptance.

Party A shall organize the acceptance within three days after receiving the acceptance notice and fill in the project acceptance form.

If the certified project quality does not meet the standards agreed in the contract, the relevant expenses incurred in the certification process shall be borne by Party B.

6.4 do not dismantle the indoor load-bearing structure.

Article 4 project supervision 4.1 if the project is subject to project supervision, Party A and the supervision company shall sign a separate project supervision contract, and notify Party B of the name, unit, contact information and responsibilities of the supervision engineer.

12.3 the warranty period of the project is two years from the date of signing by both parties after acceptance.

Article 2 construction period of the contract 2.1 construction period: days (subject to the actual working days).

Article 5 construction drawings 5.1 both parties agree that the construction drawings shall be provided in the following ways: Party A entrusts Party B to design the construction drawings in triplicate, with party a holding two copies and Party B holding one copy, and the design fee shall be borne by Party B.

7.2 strictly implement the relevant provisions of the city, and do not disturb residents and pollute the environment.

if the certified project quality meets the standards agreed in the contract, the relevant expenses incurred in the certification process shall be borne by Party A.

After passing the stage acceptance, Party B shall fill in the project acceptance form.

3.

2.2 commencement date: MM DD YY.

Completion acceptance.

12.2 Party B shall notify Party A to participate in the acceptance three days in advance.

Article 13 payment method of project funds 13.1 after the project passes the acceptance, Party B shall propose the project settlement to Party A and send relevant materials to Party A.

2.3 completion date: MM DD YY.

Doka Floor Prop

7.4 ensure the cleanness of the construction site, and be responsible for cleaning the construction site after the completion of the project, and the garbage cleaning expenses shall be borne by Party B.

Click the blue word to pay attention to us in case of need ~ the employer of the construction contract of the office building decoration project (hereinafter referred to as Party A): the contractor (hereinafter referred to as Party B): the designer of the project:____________________ Contact number:____________________ Construction team leader:____________________ Contact number:____________________ In accordance with the provisions of the contract law of the people’s Republic of China and other relevant laws and regulations, and in combination with the characteristics of the decoration of family rooms in this city, Party A and Party B, on the basis of equality, voluntariness and consensus through consultation, on matters related to Party B’s contracting of Party A’s office building decoration project (hereinafter referred to as the project), Reach the following agreement: Article 1 project overview 1.1 project location: 1.2 project content and practice: 1.3 project contracting method: Party B contracts labor and auxiliary materials, and Party A supplies main materials.

Acceptance of concealed works.

Other circumstances in which Party A agrees to postpone the construction period.

Party A shall handle the settlement procedures with Party B within 30 days after receiving the materials.

(including labor costs and auxiliary materials, the main materials are supplied by Party A, see Annex III: list of main materials of the project supplied by Party A) 3.2 amount in words: 10000 yuan only.

Material mobilization acceptance.

Article 7 Party B’s work 7.1 during the construction, strictly implement the safe construction operation specifications, fire prevention regulations, construction specifications and quality standards, and complete the project on schedule with high quality.

9.2 for the materials provided by Party B according to the contract, Party B shall notify Party A before the materials arrive at the construction site, and both parties shall jointly accept them.

Both parties shall fill in the project settlement sheet and sign for approval..

Article 11 quality standard 11.1 both parties agree that the construction quality of the project shall be implemented in accordance with the standard of quality acceptance standard for family room decoration engineering; During the construction process, both parties have disputes over the project quality, and apply for the certification of the project quality by the technical supervision department.

Article 6 Party A’s work 6.1 three days before the commencement, create conditions for Party B to enter the construction site and handle various applications, approvals and other procedures involved in the construction.