On July 27, LV hang, deputy general manager of the 12th company, Wu Qi, deputy secretary of the Party branch and chairman of the labor union, Li Chaoyi, deputy general manager, and Hei Yajun, deputy general manager and chief engineer, came to Qingdao GUI language Chaoyang project to carry out half a year’s work investigation.
5 on behalf of the project department, project manager dengmingze expressed his gratitude to the company’s leaders for their arrival and actively implemented the relevant issues raised by the company’s leaders.
While strengthening epidemic prevention and control, we will ensure sufficient materials and labor, earnestly grasp safe production, go all out to complete production tasks, conscientiously implement the work of the project department, strive to achieve the satisfaction of the government, the construction unit, and the group company, and submit a satisfactory answer to the industry colleagues who care about and support the project construction, Establish a high-quality brand project of Shaanxi Construction in Qingdao…
Pay close attention to production tasks, strictly follow the construction schedule, ensure the supply of materials and labor resources, pay attention to the actual situation on site at any time and correct deviations in time; Third, we should pay attention to epidemic prevention and control, implement measures to prevent and control the epidemic, and adhere to two yard sweeping, daily disinfection and sterilization and body temperature detection.
At the same time, after listening to the project report, analyze the management difficulties and problems at the current stage of the project, and put forward effective solutions.
Li Chaoyi, the leader of the monthly inspection team, affirmed the recent work achievements of the project department and clearly felt the changes of the project department, and put forward the following three requirements for the project: first, strengthen team building, further clarify the responsibilities of each post, refine the scope of division of labor, pay close attention to the work content of each business link, and implement it in strict accordance with the Japanese management standard of Greentown and the relevant contents of the standardized management manual of the group company, Build a management team with execution and combat effectiveness; The second is to clarify the production tasks, always put safety production in the first place, take the group’s supervision and management measures as the starting point, and strengthen safety education and training based on entering the site safety education and watching “lessons of life II”, so as to improve the safety awareness of all employees.
Reserve sufficient epidemic prevention materials, pay real-time attention to the latest local epidemic policies, and ensure epidemic prevention and control and safe and stable operation.
In the morning, after the members of the investigation team and the inspection team first listened to the semi annual work report and the monthly construction report of the project, the team members went to the construction front line in groups to comprehensively inspect the on-site safety production, construction progress, engineering entity, technical quality, material management, team building, humanistic care, corporate culture, seal management and other materials, and provide targeted guidance after viewing the relevant office materials.
The inspection members reported and commented on the problems found in the specific inspection process, and put forward targeted opinions on the feedback problems.
Li Chaoyi led song Qilei, the head of the production department of the 12th company, Wang Wenbo, the head of the safety department, and Liu Jun, the person in charge of centralized mining, to the project for monthly inspection, accompanied by the main management personnel of the project.
In the afternoon, a briefing on the investigation and inspection work was held.
In order to really improve the effect of project management, the team members of the research group went deep into basic management according to their different work contents, found the corresponding responsible comrades of the project department, carried out accurate and effective work guidance one-on-one, and asked the comrades of the project department to conduct self-examination and self correction on their own work.
In the next step, we will clarify responsibilities, refine the division of labor, focus on tasks, and never relax.