“Ziruiyuan” construction bidding, “winery Street” entrance, “public skating hall” rudiment, “Xiong Shang high speed railway” pre

After the completion of the special railway line project in the future, it will connect with Shide railway and open up a transport channel for the construction of dry port hub.

It is reported that the Hengshui international dry port project is located in the southeast of qingliangdian Town, Wuyi County, Hengshui City.

Building 8 # with a proposed area of 5380.96m ² m ², 10 floors above the ground.

There are 1000 stands, with a standard ice surface area of 1830 square meters (61 * 30 meters).

The business building covers an area of 8.009 Mu and the proposed total area is nearly 30000 square meters, including 22300 square meters above the ground.

The project covers a total area of about 4388 mu, with a total planned area of about 1.5 million square meters and a planned total investment of 4.2 billion yuan.

The planned construction period is 900 days: building # 7 # in the renderings of the marketing center of ziruiyuan project, with a planned area of 10865.2m ², 15 floors above the ground.

9 # building, with a proposed area of 10853.26m ², 15 floors above the ground.

It is mainly to build railway port, highway port, bonded logistics center, agricultural Cold Chain hub economic center, bulk material processing and trade center and other functional blocks.

After completion, it can undertake provincial-level and above ice and snow events.

Previously, the Hengshui international dry port project was planned to be invested and constructed by Yibo group (now Hebei Dry Port Construction Group) and has been supervised and promoted by Wuyi County.

Building 10 # with a proposed area of 5375.44m ², 10 floors above the ground.

01 real estate / commercial: (1) the demolition of the original hengganda home Plaza (Lubei store) at the northwest corner of central street of Daqing road has been completed.

Business building” project on the west side of central street in the southern New Area and the south side of Hengshui Federation of trade unions building: the construction progress of Tianzheng business building is actually photographed.

It is mainly planned to build a high-rise public building with 2 floors underground and 14 floors above ground frame structure core tube structure, with a fire height of 58.85 meters.

Building 6 # with a proposed area of 5433.68m ², 10 floors above the ground.

The project is equipped with functional rooms such as athletes’ lounge and underground parking lot.

Proposed area of garage: 18541m ², Total: 82713m ²。 The area of the community is 131-238m, mainly to improve the large-scale apartment ² Between.

15 # building, with a proposed area of 5261.85m ², 10 floors above the ground.

Ziruiyuan project covers an area overlooking Lishui Bay Community 02 urban construction / city / people’s Livelihood: (1) at the beginning of last week, Hebei communications investment Logistics Co., Ltd., Hebei inland port construction group and Hengshui construction investment group reached a strategic cooperation framework agreement on the construction of Hengshui international inland port project, and reached a cooperation intention on the construction of Hengshui international inland port project.

12 # building, with a proposed area of 9167.98m ², 15 floors above the ground.

2 # building, with a proposed area of 6200.82m ², 15 floors above the ground.

Building 4 # with a proposed area of 11540.99m ², 16 floors above the ground.

According to the previous official channels, since the beginning of this year, the feasibility study review of Hengshui international land port railway special line project (which is led from the south side of the East throat of qingliangdian station in Wuyi County, and extends in the southeast after the existing Shide line passes through the Hanhuang line, and enters the loading and unloading yard in Hengshui international land port about 1.5km away, with a total length of about 3.2km) has been promoted.

Halfen Frimeda

According to the framework agreement, it is planned to establish a new platform company through consultation among the three partners, with the goal of building a modern large-scale comprehensive logistics park with three-dimensional railway, sea and air transport as the target, and focusing on the construction of railway port, multi-functional zone and multi-modal transport base.

Building 3 # with a proposed area of 11484.8m ², 17 floors above the ground.

The above residential buildings are all two floors underground.

(2) The main structure of Hengshui public skating rink project, which is located in the south of Hengshui Olympic Sports Center, east of Wugong canal and north of green city Chengyuan, has been completed.

The first floor above the ground is a public lobby, the second floor is an open office hall, the third to fourteenth floors are offices, and the roof is an elevator machine room, a water tank room and a fan room.

The total area of the public skating rink project is about 62 mu, the base area of the skating rink is 9100 square meters, and the total proposed area is 15174 square meters, of which the proposed area of the ground main rink is 11700 square meters.

Building 11 # with a proposed area of 5736.39m ², 10 floors above the ground.

(3) The construction and supervision bidding of “Laobaigan Tianfeng ziruiyuan” residential project in the east of the central street, the east of Hehua Street (Planning) and the south of Jinghua Road (Lishui Bay) in the southern New Area, with a total proposed area of about 159000 M ²。 Construction general contracting section I, with a total proposed building area of 76786m ², Including 7 high-rise residential buildings and garages, with a planned construction period of 900 days: 1 # building, with a planned area of 11425.18m ², 17 floors above the ground.

16 # building, with a proposed area of 2323.87m ², 2 floors above the ground.

The above residential buildings are all two floors underground.

When the headquarters building of Tianzheng real estate group is completed, landmark clusters will be formed in the south area with Hengshui Federation of trade unions building, Olympic Sports Center, public skating hall, etc., which will greatly enhance the city’s image.

Building 14 # with a proposed area of 9248.7m ², 15 floors above the ground.

Building 5 # with a proposed area of 11569.21m ², 15 floors above the ground.

However, due to investment landing and other problems, the project has been stuck for many years without any progress.

Proposed area of garage: 13751m ², Total: 76786m ²。 The second section of the general construction contract, with a total proposed area of 82713m ², It includes 8 high-rise residential buildings, 1 2-storey marketing center and garage.

Renderings of Tianzheng business building: the underground is mainly planned to be a parking lot and equipment room.

(2) construction progress of “Tianzheng.

03 transportation: (1) the construction unit of the new project in distillery Street (Fuyang Road – Fuyang 1st Road) enters the site and is preparing for the preliminary work of commencement..

The change of investment and cooperation subjects and the emergence of new platform companies are expected to play a positive role in accelerating the implementation of the project.

13 # building, with a proposed area of 5340.27m ², 10 floors above the ground.