First, understand the construction quality control and inspection of steel deck pavement

Chongqing Jianke Xinhui Transportation Technology Co., Ltd.

The process control method is adopted for the control of the construction quality of steel deck pavement, and the quality control method is adopted for the pavement materials, mixtures and each pavement layer to test and verify the pavement construction control effect.

For special road (bridge) pavement, cement concrete pavement special pavement and asphalt pavement maintenance technology, adhering to the business philosophy of “leading technology, professional service and sustainable development”, we are committed to providing various customers with high value-added technologies and integrated products, and providing integrated services from the aspects of scheme design, design optimization, technical services, standardized construction and later maintenance, aiming to provide customers with more professional A more hassle free user experience.

The process control method is to control the quality, that is, during the construction process of each layer from steel plate sand blasting and rust removal to the completion of pavement construction, strictly control the factors affecting the construction quality, such as control of construction conditions, construction equipment and construction technology, so as to achieve the purpose of high-quality bridge deck pavement.

The construction of the next process can only be carried out after the previous process passes the inspection.

10) Quality control points for rolling of modified asphalt SMA Mixture: (1) compaction process (number of compaction passes, whether the rolling is closely followed by the paver, and the length of rolling working face is not more than 30m); (2) Rolling temperature guarantee; (3) Compaction degree (compaction degree is controlled by controlling the rolling process); (4) Ensure the compactness of construction joints.

Among them, the measurement calibration of main equipment shall pass the measurement verification by the measurement department.

The construction unit can increase control points and formulate control measures according to the needs of construction quality control.

5) Quality control points of pouring asphalt mixture transportation: (1) temperature control during transportation; (2) Control of transport vehicle driving and waiting time for paving; (3) Precautions for driving on the waterproof adhesive layer; (4) Coordination with paver during unloading; (5) Temperature of mixture during unloading.

The construction quality control requirements of asphalt, aggregate and asphalt mixture for steel deck pavement are shown in Table 5-1, and the construction quality control requirements of pavement structure layer are shown in table 5-2.

9) Paving quality control point of modified asphalt SMA mixture (1) paving smoothness; (2) Traveling speed of paver; (3) Loose paving thickness; (4) Paving temperature.

It is characterized by providing pavement system solutions and creating a road construction service platform with comprehensive pavement technology as the core.

8) Transportation quality control points of modified asphalt SMA Mixture: (1) thermal insulation measures during transportation; (2) Control of transport vehicle driving and waiting time for paving; (3) Precautions for driving on the poured asphalt layer; (4) Coordination with paver during unloading; (5) Temperature of mixture during unloading.

5.3 control test of construction quality of steel deck pavement the main purpose of control test of construction quality of steel deck pavement is to better control the construction quality and facilitate the supervision engineer to better grasp the project quality.

Excellent team of construction and technical services.

12) Quality control points of waterproof and drainage treatment: (1) steel bridge deck drainage (drain hole); (2) Cross slope guarantee.

is determined to become an excellent team in technical research, consulting, materials, construction and technical services in the transportation and road industry.

The enterprise is positioned as a service provider of environmental protection and special pavement solutions.

It focuses on the construction quality control and testing of Road (bridge) methacrylic acid resin (MMA) specialty, specialty, and then specialty steel deck pavement.

Chongqing Jianke Xinhui Transportation Technology Co., Ltd.

11) Construction joint setting and treatment quality control point (1) construction joint position; (2) Compactness and flatness near longitudinal construction joints.

7) Production quality control points of modified asphalt SMA Mixture: (1) aggregate performance; (2) Grading and hot bin secondary distribution; (3) Mineral powder addition amount; (4) Whether the fiber is stably added; (5) Mixing time and temperature; (6) Asphalt consumption.

6) Paving quality control points of pouring asphalt mixture: (1) traveling speed of paver; (2) Mixture fluidity observation; (3) Paving temperature; (4) Position and height of lateral limit plate; (5) Treatment of longitudinal joints; (6) Distribution amount and uniformity of crushed stone.

2) Quality control points of anti-corrosion layer and waterproof adhesive layer: (1) performance of raw materials; (2) Construction conditions (temperature and base level); (3) Coating amount (full cloth, thickness) and uniformity; (4) Brushing process; (5) Bond strength.

Anchor Nut For Tie Rod

3) Mixing quality control points of modified asphalt: (1) uniformity of modified asphalt; (2) Performance of modified asphalt; (3) Storage temperature and time.

For equipment with calibration device (such as no nuclear density meter), the measurement calibration can be carried out under the supervision of the supervisor.

Technical consultation hotline: 023-8860209813508339085 technical consultation QQ: 1928660024..

1) Quality control points for sand blasting and derusting: (1) whether the steel plate has been cleaned and free of oil; (2) Construction conditions (temperature and humidity); (3) Roughness and cleanliness.

5.1 equipment measurement and calibration before construction, various production equipment and testing equipment shall be measured and calibrated.

5.2 construction quality control of steel bridge deck pavement here, the main control points of materials and construction quality of each structural layer of pavement are listed.

4) Quality control points of joint strips: (1) whether the base surface and corner are dry and free of sundries; (2) The position of the seam strip has been fixed.