Just paint it on the ground.
If the ground is cracked or there are potholes, you can directly fill them with freshly mixed concrete.
They can be used by adding water directly, without the need to buy additional cement and sand.
Of course, it is good.
After construction, the sealing curing agent has strong performance, but it is not omnipotent.
One thing it cannot help.
A little grinding with the grinder can arrange curing agent.
The foundation of the ground is well laid, and the solidified floor can achieve twice the result with half the effort.
This means that the environment must be improved.
Most of the ground should be clean and tidy after construction, which can meet the environmental requirements for equipment use, ⚠️ The cracks and holes must be treated properly.
PS: The official small store of Dr.
But the ground with such a good foundation is rare, just like handsome men and beautiful women.
You has a wide range of online products, with clear prices and frequent benefits.
◉◉◉◉◉◉◉◉◉◉◉◉◉◉◉◉◉96.
If you want them to be integrated and closely connected with each other, even more closely than the old concrete, you need to use additional additives to improve the overall quality of the concrete floor.
However, curing the floor is not a matter of buying two barrels of sealing curing agent.
If it doesn’t take two years, it is not interesting to see all kinds of young moths.
The new concrete is an outsider.
The ground is not as good as it used to be.
If the factory wants to keep pace with the times, the quality and quantity of products must be improved.
Click to go in and have a look! 👏👏👏 Click Jump 👇 Previous recommendations+Why do Wal Mart and other large supermarkets choose sealed and solidified floors?+ The factory’s epoxy floor is aging and delaminating, and regrets not making a sealing curing floor+lithium based curing agent: the hospital floor must be made of microsignal: UBS13809620746 ●.
With the rapid development of society, people’s requirements for product quality are also improving.
The current floor, with high requirements, is even absolutely dust-free and static free, and can withstand the weight of equipment above tonnage.
Of course, the previous methods alone will not work.
That is to say, what is the original ground? After construction, it will be like.
Advanced equipment and production technology have requirements on the environment, especially the ground.
The current repair agents are very convenient.
Even if the ground is dusty and sandy, cracks are everywhere, and holes are everywhere, as long as it can support people and put machinery and equipment, everything will be fine.
⚠️ The factory needs to introduce new equipment and production technology.
But there is a problem.
Need to buy repair agent? Buy a bag of cement and mix it with sand.
A piece of ground is clean and tidy, without cracks, potholes and pitted surfaces.
If you want to complete this work, you need to purchase concrete repair agent.
As a kind of floor with high cost performance on the market, the concrete sealing curing agent floor is deeply loved by factories, so more and more people are making curing floors.
For the old concrete, it is difficult to melt into it and become a whole.
💥 Why do I need to purchase additional repair agents? This is indeed a question that needs to be answered.
⚠️ The ground cannot be repaired.