These two sections of Hengyang will be occupied for construction, please detour!

Wire Ring Clutch

Share it for more people to see..

The construction time of road occupation at the south side of Chuanshan Avenue (Lianhu Road North Ring Road) in Shigu District: October 24, 2022 to November 20, 2022.

During the construction, please follow the instructions of traffic signs for passing vehicles and pedestrians, follow the instructions of the on-site traffic police, slow down and pay attention to safety.

The construction time of Hongxiang North Road (Taiping Road Chuanshan Avenue Section) in Zhengxiang District is from October 31, 2022 to November 10, 2022.

Bypass plan: During traffic control, vehicles passing by can bypass North Zhengxiang Road or Cailun Avenue.

Fully closed construction section: Hongxiang North Road (Taiping Road Chuanshan Avenue section) in Zhengxiang District.

Semi closed construction section: south of Chuanshan Avenue in Shigu District (Lianhu Road North Ring Road).

Due to the general contracting requirements for the design and construction of the old natural gas pipeline network reconstruction project in Hengyang City, the fully closed road occupation construction is carried out on Hongxiang North Road (Taiping Road Chuanshan Avenue Section) in Zhengxiang District, and the semi closed road occupation construction is carried out on the south side of Chuanshan Avenue (Lianhu Road Huancheng North Road Section) in Shigu District.