On October 27, the Maitreya South Bridge was closed for construction and bypassed!

At 9:00~17:00 on October 27, the south bridge deck and bridge approach of Sanna Line (Old 326 Line), a county road in Mile City, were repaired.

Rebar Chair

During the construction, the road was closed and vehicles and pedestrians bypassed.

Source: Maitreya Traffic Police Brigade Advertising Cooperation Tel.: 14787831317 WeChat: Daclepeng..