Please choose the travel route in advance, avoid the congestion time, and obey the management of on-site traffic attendants.
Diagram of Traffic Control and Bypass Route 2.
We apologize for the inconvenience caused.
In order to avoid the excessive congestion of Xinhua East Road (Gate 1 of the company’s production area – air separation road section) in the morning and evening peak hours as much as possible, some employees may consider entering the production area through the Zhanshui Road checkpoint of New Materials Science Park.
Source: Jiangbei New Town, Internet Nanjing Communication Integration Editor (please contact for deletion if there is infringement)..
After the study and approval of the traffic organization during the construction period, the project needs to occupy the road for construction, and the construction period is expected to be about 90 days.
Please click the blue text above to see more! Introduction In order to improve the overall technical status of Macha River Bridge on Xinhua East Road, eliminate various potential safety hazards, and ensure the safe operation of the bridge, according to the requirements of the competent department of the New Area, the Public Construction Center of Jiangbei New Area will repair and reinforce the bridge.
All commuter vehicles used to go to and from work must go through Macha River Bridge on Xinhua East Road and other roads on Zhanshui Road.
At that time, the traffic organization of Macha River Bridge on East Xinhua Road will be adjusted: the construction time of the road occupation is estimated to be 2022.10.24-2023.31.
7:00-8:30 am: The Macha River Bridge on East Xinhua Road will be one-way from south to north.
After the construction is completed and the traffic control is removed, the normal commuter line shall be restored.
Employees who need to apply for the access right at the checkpoint of the New Materials Science and Technology Park can submit relevant materials to the unit’s special leader, who will uniformly apply to the Safety and Environment Department for opening the access right.
Trucks are prohibited from passing through Macha River Bridge on Xinhua East Road throughout the day.
2.
The route adjustment: the transfer point at Gate 3 – South Refinery Road – Finished Product Road – Zhanshui Road – all stations in the living area.
Other periods: two-way traffic.
Special person in charge of the Safety and Environment Department: Liu Haitao Tel.: 58560987 Adjustment of commuter train operation route 1.
From 7:00 to 8:30 in the morning peak, as the Macha River Bridge on Xinhua East Road is one-way from west to east, the commuter train will transfer at Gate 3 and then travel from Macha River Bridge on Zhanshui Road to the living area.
The traffic organization adjustment plan during the construction of the half width road enclosure.
The current roads need to be occupied during the construction of the network map.
1.
3.
Since half of the road is blocked during construction, which may cause road congestion, it is recommended that employees take the company’s commuter bus to work.
4.