Notice on Traffic Control during Construction of Fengxin Bridge, Longshan Bridge and Huangsha Port Bridge

3.

5、 For other matters, vehicles and pedestrians should plan their travel routes in advance to avoid congested roads as much as possible.

Personnel and vehicles in the High tech Zone should take Tiangong Avenue and Changle Avenue, vehicles in Chitian and Songbu directions should take Tiangong Avenue, and vehicles in Shangfu direction should take Huancheng North Road and Hualin Bridge to get in and out of the city.

The traffic control time is from November 1, 2022 to May 2024.

3、 During the construction of the Longshan Bridge on the restricted section, vehicles passing through the Longshan Bridge will slow down.

4、 Bypass suggestion 1.

It is hereby announced as follows: 1.

2、 Forbidden sections: Fengxin Bridge, Huangsha Port Bridge, Huangsha Port Road (Huangsha Port Bridge to Huangsha Port Second Bridge).

In order to ensure traffic safety during bridge construction, according to the Road Traffic Safety Law of the People’s Republic of China, traffic control will be carried out on the construction section during the project construction.

Notice on Traffic Control during the Construction of Fengxin Bridge, Longshan Bridge and Huangsha Port Bridge.

Fixing Socket Angular End Nail Plate

For pedestrians and non motor vehicles passing by Fengxin Bridge, please go to the pedestrian steel bridge downstream of Fengxin Bridge to bypass.

For vehicles crossing the river in the county, please go to Liaohe Bridge, Hualin Bridge and Tiangong Bridge.

Please forgive the inconvenience caused to your travel during the construction period! It is hereby announced! Attachment: Diagram of Traffic Control Bypass Fengxin County Traffic Police Brigade of Fengxin County Transportation Bureau October 28, 2022 Author: Fengxin Traffic Police Editor: Wei Mengmeng Reviewed by: Liu Qiang Supervised by: Chen Junmin..

2.