The bridge tunnel ratio reaches 82%! The main construction of the whole line was officially started

Material: Jiangxi Journalist Station of People’s Railway Newspaper Co., Ltd.

The total length of the main line is 137.72 km, including 134.38 km of new lines, 350 km/h of design speed, and the planned construction period is 4.5 years.

Waved Anchor

The geological conditions along the line are complex and the construction is difficult.

The Changjiu Section of Beijing Hong Kong High speed Railway has 5 stations, including Lushan Station, Lushan South Station, Gongqing East Station, Changbei Airport Station and Nanchang East Station, of which Lushan Station is an existing station.

The newly-built Changbei Airport Station is located in the west of Terminal T3 of Changbei Airport and in the east of North Extension Line of Metro Line 1.

Chang Jiu Section of Beijing Hong Kong High speed Railway is an important part of the main channel of the “eight vertical and eight horizontal” high-speed railway network in the National Medium and Long term Railway Network Plan.

(Financial Media Center of Nanchang Bureau Group) Text and picture: Zheng Bo, Wang Luque, Yang Yang, Hu Guolin, Hu Jiangang, Ni Shuxun, left editor: Duan Xingyi..

After the completion and opening to traffic of the Chang Jiu Section of the Beijing Hong Kong High speed Railway, it will connect with the existing Shanghai Kunming High speed Railway, Wuhan Jiulong High speed Railway, Xiangpu Railway and the Chang Jing Huang High speed Railway under construction, which is of great significance for Jiangxi to further integrate into the Guangdong Hong Kong Macao Greater Bay Area, help the implementation of the development strategy of the Yangtze River Economic Belt, and promote high-quality economic and social development along the line.

On November 21, the construction of bored piles for the Yangtze Ganjiang Road Railway Dual purpose Bridge in Nanchang Jiujiang Section of the Beijing Hong Kong High speed Railway started, marking that the Chang Jiu Section of the Beijing Hong Kong High speed Railway, which Jiangxi people have long been waiting for, officially entered the construction phase of the main works of the whole line.

The Chang Jiu Section of the Beijing Hong Kong High speed Railway starts from Lushan Station in Jiujiang City, Jiangxi Province in the north and ends at Hejia Village Line Post of the Chang Gan High speed Railway.

After completion, the station will become the first comprehensive three-dimensional transportation hub in Jiangxi Province to realize seamless transfer of high-speed rail, aviation and subway.

The Tianxiang Avenue Tunnel, located to the west of Yaohu Lake in Nanchang City, is another control project along the whole line, with a total length of 6.37 kilometers.

The ratio of bridges and tunnels along the Chang Jiu Section of Beijing Hong Kong High speed Railway is 82%, with 58 bridges and 21 tunnels.

Located in Nanchang City, the Yangtze Ganjiang Road Railway Bridge is a control project along the whole line, with a total length of 18.95km and a large-scale multi bridge structure.