Various pile foundation construction acceptance data, foundation pit support acceptance data

Mixing pile process: prepare cement → put pile driver in place → drill hole (add water while drilling and put cement powder for mixing) → form pile → conduct light penetration inspection three days later to inspect the data of mixing pile: construction records The items submitted for inspection of mixing pile include cement, cement soil test pieces and reinforcement..

Pile foundation process Engineering pile (static pile pressing) process: joint review of drawings – pile location number – preparation of pile driver’s walking line diagram – preparation of pile foundation construction plan – pile driver mobilization – personnel mobilization – pipe pile and pile tip sunrise and material review – quality and technical disclosure – measurement and setting out (positioning and project baseline review) – commencement application report – pile testing – piling – pile foundation detection (bearing capacity: high strain, static load) – earthwork excavation – pile cutting (up to the design pile top height) -After earthwork excavation, the pile foundation shall be rechecked and the corresponding pile position deviation diagram shall be drawn – pile foundation inspection (integrity: small strain) – inspection If there is no Class III pile, the pile can be accepted, and if there is Class III pile, the pile shall be supplemented – after the inspection is qualified and the test report is issued – the pile foundation acceptance, measurement, setting out, application for inspection (baseline review), project baseline review form, commencement report (unit project), project commencement, Resumption report Form Commencement application report of unit project Commencement report (pile foundation sub divisional project) Commencement of project, Resumption report Form Commencement application report of pile foundation sub divisional project, pipe pile and pile tip mobilization: 1.

Hammering: static pressure concrete precast pile engineering inspection lot quality acceptance record form 5.

Piling data: (after pile testing, the construction parameters shall be determined) Large scale piling.

Hammering, The quality acceptance record of inspection lot of static pressure concrete precast pile works shall be made during piling) 5.

2 drilling (punching) pile 3.

Quality inspection record of mud retaining wall (during drilling) 2.

Concealed engineering quality acceptance record form After earthwork excavation 1.

Pile foundation recheck and pile quality inspection form 3.

Mixing pile construction – earthwork excavation (applicable to shallow foundation) – anchor bolt construction – anchor bolt tension test – waist beam construction sloping: earthwork excavation – sloping – soil nails driving into the slope – slope laying reinforcement mesh surface and welding with soil nails to form an integral reinforcement mesh – shotcrete.

Engineering inspection application form 2.

Pretensioned prestressed concrete pipe pile quality inspection and appearance quality inspection and acceptance record form (made when the pipe pile is mobilized) 4.

Quality acceptance record of concrete cast-in-place pile inspection lot, The differences between the internally driven casing bored pile and the hammered sinking pipe (when pouring concrete) are as follows: the construction process test record form of the internally driven casing bored pile (trial drilling) the construction record form of the internally driven casing bored pile (large-scale drilling) the quality acceptance record of the concealed reinforcement works (before the reinforcement cage is lowered) the quality acceptance record of the concealed concrete works (when pouring concrete) Inspection lot: quality acceptance record form of inspection lot of concrete pouring pile reinforcement cage fabrication works (when the reinforcement cage is fabricated) quality acceptance record of concrete pouring pile inspection lot (when pouring concrete) Items submitted for inspection include: test piece: concrete test piece (reserved when pouring concrete) reinforcement welding test piece (delivered when the reinforcement cage is fabricated) Material: reinforcement (Because the concrete is commercial concrete, the concrete does not need to send raw materials and mix proportions) Mixing pile: the pile made of cement and soil is called cement soil mixing pile.

Project inspection application form 2.

Pretensioned prestressed concrete pipe pile quality inspection and appearance quality inspection lot acceptance record form 4.

Engineering inspection application form 2.

Quality acceptance record of concrete concealed works (when pouring concrete) 7.

Small strain (reflected wave) basement: foundation pit support engineering process: support pile construction – crown beam construction – foundation pit earthwork excavation – anchor cable construction – waist beam construction – anchor cable tension test – upper anchorage, fixture.

Summary table of construction data of bored (punched) cast-in-place piles (after all grouting is completed) Inspection lot 1.

Product quality certification documents Test pile data (determine construction parameters) 1.

3 drilling (punching) pile 4.

Pile location Deviation diagram Pile foundation detection items 1.

Hole forming construction record of No.

List of quantities 3.

1.

Concealed acceptance record of reinforcement cage installation of drilling (punching, digging) pile (before the reinforcement cage is lowered) 5.

Static pressure concrete precast pile, steel pile construction process test record form (test pile) 3.

The quality acceptance record of concealed works shall be made.

5 drilling (punching) pile Record of underwater concrete pouring of bored pile diaphragm wall 6.

No.

Record of inspection quality acceptance of concrete cast-in-place pile reinforcement fabrication works (when reinforcement cage is fabricated) 2.

High strain (static load) 2.

(Cast in place pile row construction) is applicable to deep foundation pit.

Flat End Socket

Construction process of anchor cable: data: construction record of hammering pipe sinking cast-in-place pile: construction process test record form of hammering pipe sinking concrete cast-in-place pile project (trial drilling) construction record form of hammering pipe sinking concrete cast-in-place pile project (large-scale drilling) quality acceptance record of concealed reinforcement project (before the reinforcement cage is lowered) concrete slump detection concrete concealed project acceptance record (during concrete pouring) drill core detection drilling (flushing) at 28 days Bored pile: 1.

Static pressure concrete precast pile, Steel pile construction record form 3.

Concealed acceptance record of No.

Engineering materials, components and accessories, Equipment approval form 2.