Closed construction! Detour!

In order to ensure the traffic order in this area, the relevant matters are announced as follows: First, Gongnong Road (Xinhua Road – Guangwu Road Section) will temporarily cancel one-way traffic and resume two-way traffic.

A.

The time of sacrifice was only ().

The social vehicles to Fuya area can enter and exit from Jiefang Road – Minzhu Street.

Non-motor vehicles should consciously enter the non-motor vehicle lane to drive.

The temporary inconvenience is for long-term convenience.

29 years old, D.

Drivers who often pass Minzhu Street and Jianshe Road need to keep their spirits up! Some sections of these two roads will be closed from March 4! Close! Shi! The closure time of Gongshe Road (Renmin Road – Gongnong Road Section): from 22:00 on March 4, the planned construction period is 90 days.

He tried to push his comrades out of the cave, but he was buried in the cave.

27 years old, B.

Please pay attention to “Ping An Nanyang” and easily control the “micro police station”.

30 years old, scan or long press the QR code below.

The construction content: the demolition and reconstruction of Fuya Minzhu Street Bridge is to ensure the traffic order in the area.

Nanyang Micro-police Bureau specially reminds that when passing the above road sections, drivers and pedestrians should follow the traffic signs and markings and obey the command of the traffic police.

At present, more than 2300000 people have paid attention to and joined us to sort out: Lai Baohu Editor: Wu Lincong First review: Guo Hui Final review: Wang Long.
.

After the completion of pavement repair, it will be more convenient for everyone to travel! Source: Nanyang Daily Nanyang WeChat reported that Zhang Side, the hero who reads the red story every day, [read the story to find the answer] On September 5, 1944, when Zhang Side and his comrades were carrying out the task of digging a charcoal kiln in Ansai County, northern Shaanxi Province, the cave that was about to be dug collapsed suddenly.

The medical vehicles drive into the east gate through the special passage and out of the north gate of Guangwu Road.

After the demolition of Minzhu Street Bridge, two temporary floating bridges will be built, and pedestrians can enter and leave the government area through Minzhu Street floating bridge.

(The picture is provided by Nanyang Central Hospital) III.

The closure time of Fuya Minzhu Street Bridge: from March 4, the construction period is planned to be 90 days.

28 years old, C.

During the construction period, some bus lines passing through Jianshe Road (Renmin Road – Gongnong Road) will be diverted.

2、 A special passage for medical treatment is set outside the east wall of the central hospital.

Fixing Socket Angular End Nail Plate

Now the relevant matters are announced as follows: the one-way traffic of Fuya Minzhu Street is temporarily canceled, and the two-way traffic is restored.