It is expected to be completed and opened to traffic in July! The construction of Yuhang, the guarantee project for the Asian Games, has

Pingcang Avenue is the main passage from Pingyao to Cangqian and the only way to get on and off vehicles on Hangchang Expressway.

On the other hand, the erection of guardrails is also in hot progress, and concrete pouring can be carried out after the reinforcement foundation structure is erected.

It is expected that the whole bridge deck construction will be completed in May, and the whole line of Pingcang Interchange will be completed and opened to traffic in July.” Xu Mingjie said.

Fixing Socket Cross Pin Nail Plate

Source: Yuhang issued a solemn statement: The copyright of this article belongs to the original author,
.

“Before the 15th day of the first month, we have recovered to the highest level of employment before the year, and the number of construction personnel is still increasing gradually.

As an important project to ensure the Asian Games, at present, the Bottle Warehouse Interchange of the Reconstruction Project of National Highway 320 is struggling to catch up with the progress! At the construction site, more than 20 workers are laying the elevation belt on the F ramp and straightening and leveling the measuring white line to set the standard for the subsequent standardized pavement of the bridge deck.

Xu Mingjie, assistant to the director of the district traffic engineering construction service center, said: “At present, the bridge substructure and beam slab erection are being implemented at this node of the Pingcang Interchange, and 63.5% of the total work volume has been completed.

As an important project to ensure the Asian Games, the completion of the Bincang Interchange will effectively improve the traffic conditions of the Bincang Avenue, and the passing masses can more easily travel to and from Pingyao Town, Yuhang Street, Liangzhu Street, and enter and exit Hangchang Expressway.

At the same time, through the interchange ramp, it can also achieve rapid transformation with various traffic systems and improve the layout of Yuhang urban road network.

The substructure is basically completed, and is expected to be completed by the end of February.” The Pingcang Interchange of the National Highway 320 Reconstruction Project is constructed according to the interchange standard, with a total of 9 ramps, with a total length of 5.29 kilometers, and a design speed of 40 to 50 kilometers per hour, It is one-way two-lane.