The construction of four stations of Jiaozhou Metro Line 8 is temporarily postponed? What’s the matter?

After completion, it will become the backbone mode of transportation from the core area of Jiaozhou to the central urban area of Qingdao.

The total investment is 16.515 billion yuan, of which the investment in Jiaozhou section is 14.123 billion yuan.

Up to now, the specific reasons for the suspension of construction are unknown, and no official information has been released.

At the construction site of the underground project of Daguhe Museum Station of the branch line of Metro Line 8, the reporter saw that the engineering technicians carried out the binding and welding of the underground floor reinforcement according to the construction process.

It is planned to complete the land acquisition and relocation of the branch line project of Metro Line 8 in December 2022.

If the message is true.

8 branch line insisted on construction.

A few days ago, Taihu Road Station successfully passed the acceptance of commencement conditions, becoming the first station to complete the acceptance of commencement conditions in 2023 and the ninth station to complete the acceptance of commencement conditions for the branch line of Metro Line 8.

There are more than 80 engineers and technicians on the construction line every day, and more than 100 sets of machinery and equipment are working overtime to race against time.

If there is any infringement, please contact us immediately.

Taihu Road Station, as the starting station of the shield section, is planned to complete the main structure construction before the end of the year.

The main body and auxiliary parts of the station adopt open excavation method.

PVC Chamfer

The excavation risk is very high.

of the Peninsula Metropolis Daily).

(The screenshot is in the Jiaozhou News Video of Peninsula Metropolis Daily.) According to the official information, according to the construction plan, the total construction period of the branch line of Metro Line 8 is 5 years.

The main structure of the station is a two-story arched station without columns.

It is the transportation and livelihood project with the largest investment scale and the widest benefit to the citizens in Jiaozhou.

However, the author of social media said that the problem land was not clarified in his reply to netizens’ questions.

1, which concerns everyone in Jiaozhou! Exposure! Just pay for airport work? Jiaozhou people should not be fooled again! Dismantle! The announcement of land expropriation in Jiaozhou is released! Exposure! Jiaozhou Community One is on fire again!.
.

(The screenshot is in the Jiaozhou News Video No.

Taihu Road Station is 206 meters long, 24 meters wide, and 21.5 meters deep.

In just one week, Metro Line 8 has suddenly changed from a busy overtime rush to a delay in construction.

We will deal with the total investment of 10.272 million yuan in time! The five villages in Jiaozhou will be greatly changed! Jiaozhou will introduce Decathlon? The official response is coming! No yellow! The latest response from Shanghe Campus of Qingdao University is coming! “Hundreds of boxes of ibuprofen were thrown into the garbage can”! Netizen: How annoying! Emergency warning → heavy weight! The 20 villages in Jiaozhou will be expropriated! Jiaozhou’s latest personnel appointment and removal! Spread! These roads in Jiaozhou will be closed for construction! Pay attention to detour! A citizen of Jiaozhou bought a car and found it was a serious accident car during maintenance! Heart wrenching! A woman in Jiaozhou fainted by car! Private cars turn into “ambulances” every second Official: No planning application has been received for this project in Jiaozhou! From today on, the bus line in Jiaozhou will resume its original operation! Jiaozhou Municipal People’s Government has issued Document No.

The public can’t help worrying about whether the suspension of construction will affect the completion and opening of the whole branch line as scheduled! Click the official account card below to follow! Source: Jiaozhou News Video No./Jiaocheng Life/Internet copyright of Peninsula Metropolis Daily belongs to the original author.

We have increased the investment in human and material resources.

Such a big turning point is really puzzling and controversial.

But just recently, some local social media released a message about “the construction of the section from Shaohai North Station to Haier Avenue Station of Metro Line 8 is suspended, involving four stations, namely, Shaohai North Station, Taihu Road Station, Zhanqian Avenue Station and Haier Avenue Station”, which aroused public concern and suspicion.

According to the plan, the Jiaozhou Railway Station – Dajian Station will operate for 23 minutes after the subway is opened; Jiaozhou Railway Station – May Fourth Square Station runs for 62 minutes, and the old city of Jiaozhou is included in the one-hour life circle of Qingdao.

In February 2027, the joint commissioning and test of the branch line project of Metro Line 8 will be completed and the trial operation of the branch line project of Metro Line 8 will be started.

In November 2026, the construction of the branch line of Metro Line 8 will be completed.

Therefore, the construction of Qingdao Metro Line 8 has always been the focus of Jiaozhou people’s attention.

of the Peninsula Metropolis Daily) (Video source: Jiaozhou News Video No.

It is a key project to promote the three-year urban renewal and urban construction in Qingdao.

The station earthwork is about 90000 cubic meters.

The branch line of Metro Line 8 is the first rail transit line in the core area of Jiaozhou City.

Just last week, local officials and several media reported that the 11 stations set up in the urban area of the city for the construction of the branch line of Metro Line 8 are fully promoting various projects.

Set off the construction climax in an all-round way.

During the Spring Festival, the No.