1) Ensure that the construction basis is correct; 2) Control the professionalism of operators; 3) Equip necessary construction machinery and testing equipment; 4) Implement the three inspection system; 5) Control the construction environment; 6) Reasonably arrange the construction schedule; 7) Take protective measures for finished and semi-finished products; 8) Monitor the entire construction process of weak links; 9) It is strictly prohibited to use outsourcing as a substitute for management; 10) Maintain timely and accurate technical disclosure and understanding; 11) Engineering changes should meet construction requirements.
.