The entire road section will be closed for construction starting tomorrow.
The Liaoyuan Road project starts from Shaoxing Road and ends at Cuobuling Second Road.
The construction process inevitably has a certain impact on the production, living, and travel of surrounding enterprises and residents.
In addition, the increase in water consumption by surrounding residents makes the original pipeline unable to meet the water supply requirements.
In addition, Qing Baojun learned from Qingdao Water Resources Hairun Water Supply Group that the renovation project of Liaoyuan Road water supply network will start construction on March 10th.
The closure period is from March 10, 2022 to August 10, 2022, with fully enclosed construction.
The starting point of the closed section is the intersection of Liulong Road and Taizhizhuang Village, and the ending point is the intersection of Liulong Road and Beizhao Line.
In order to minimize the impact, Qingdao Water Group follows the basic principles of “safety, less occupation, fast return, smooth roads, open pipes and green”, takes active and effective measures against dust control, light pollution, construction noise, traffic diversion and other aspects during construction, and formulates a low impact construction scheme to ensure safety, less occupation of roads and disturbance to residents, fast construction and retreat, smooth roads, smooth pipe networks and green construction.
generally known! Forward and tell friends who live nearby~The power of Qingdao Daily’s original creation has a greater impact
.
Jimo District will accelerate the progress of project construction, ensure timely completion and opening to traffic, and provide smooth and convenient transportation conditions for people’s travel and the economic development of the entire region.
It is reported that the original water supply pipeline on Liaoyuan Road has been in service for many years and has certain safety hazards.
the section from Lan Road to Beizhao Road) in Jimo will be expanded and rebuilt.
The replacement of a 375-meter diameter water supply pipeline with a diameter of 300mm is planned to be completed in one month.
At present, all preparations have been put in place and we will strive to complete the construction task in the shortest possible time.
Diversion plan: ① Vehicles heading west to east towards Taizhizhuang on the Beizhao route: turn left at the intersection of Beizhao Road and Lanwang Road → the intersection of Yangjiazhuang Village → that is, Lan Road.
② Vehicles heading east to west towards Taizhizhuang on the Beizhao route: turn right at the intersection of Beizhao Road and Lanwang Road → the intersection of Yangjiazhuang Village → that is, Lan Road Vehicles heading west to east towards Tuanwan Village on the Yilan Road: turn right at the intersection of Yilan Road and Chenggezhuang Village → Yangjiazhuang Village Road → Beizhao Road.
Qingbao Jun learned that Liulong Road (i.e.
④ Vehicles heading east to west towards Tuanwan Village on the Yilan Road: turn left at the intersection of Yilan Road and Chenggezhuang Village → Yangjiazhuang Village Road → Beizhao Road.
Currently, construction organization design, traffic organization plan review, design technical disclosure, and installation of traffic flow control signs for the surrounding road network have been completed.