Tangshan: Due to the construction of the Beijing Tang intercity railway, these two sections will be cut off for construction tomorrow!

To ensure the orderly operation of public transportation routes during the road construction period and ensure the travel and transportation of passengers, the public transportation company will take routes 2, 4, 22, 26, 30, 42, 45, 55, 56, 84, 99, 112, K2, and K3 that pass through two sections A temporary detour plan has been formulated for 17 bus routes including D02 Road, You 5, and Intercity 2.

Lifting Foot Anchor

Route 22: The line starts from Guomaofu South Station and travels to Zhanqian Road Beixin Road Intersection, temporarily bypassing Beixin Road and Zhu’an Road to return to the original line for operation
.

Notice on Temporary Diversion of Public Transport Route Due to the construction needs of the Beijing Tang intercity railway, Xishan Road (Zhanqian Road Zhu’an Road) and National Defense Road (Zhanqian Road Zhu’an Road) will be completely cut off for construction.

Please follow the construction signs and traffic signs to ensure safe and orderly travel in accordance with the law.

The specific detour arrangements are as follows: 1.

All routes will temporarily bypass Zhu’an Road, Beixin Road, and Zhanqian Road to return to the original route for operation.

Due to the construction needs of the Beijing Tang intercity railway, from February 15th to May 25th, Xishan Road (Zhanqian Road to Zhu’an Road) and National Defense Road (Zhanqian Road to Zhu’an Road) will be completely cut off for construction.

Traffic police reminder: The section of Nanxin Road (from Zhanqian Road to Zhu’an Road) has been opened to traffic, and citizens can bypass Nanxin Road and Beixin Road during the construction period.

During the construction period, the eight major traffic police teams will arrange police forces around the construction area to strengthen patrols and guidance.

Xishan Road (Zhanqian Road to Zhu’an Road) involves routes 26, 30, 56, and D02: The route starts from Tangshan Station and passes through Zhu’an Road to the intersection of Zhu’an Road and Xishan Road.

The temporary stops include: Liuhuoxinzhuang (south side of Beixin Road), Liuhuoxinzhuang Temporary Station (west side of Zhu’an Road), Zhanqian Road Beixin Road Intersection (west side of Zhanqian Road), Zhanqian Road Xishan Road Intersection (east side of Zhanqian Road).

Since the road construction interruption, 17 routes will be temporarily bypassed.