Construction project cost control should follow these principles

Project construction cost control is to supervise and control the input of resources, construction process and results in the process of implementation, check and measure, and take measures to ensure the realization of project cost objectives

.

The object of engineering construction cost control is engineering project, and the main body of control is human

.

The main means is to reduce engineering construction cost and increase enterprise benefits through rational use of human, material and financial resources

.

Therefore, the cost control of engineering construction should adhere to the following principles: 1

.

The principle of strict economy, which is the saving of human, material and financial resources for engineering project construction, is the basic principle of engineering construction cost control

.

Of course, saving is definitely not a negative restriction and supervision, but a positive creation of favorable conditions

.

We should focus on the prior supervision and process control of the construction cost, and often check whether there are deviations in the construction process, so as to optimize the construction scheme and achieve the purpose of saving from the Perspective of improving the scientific management level of the project

.

2

.

The principle of comprehensive control the principle of comprehensive control includes two meanings, that is, the whole staff control and the whole process control of the construction project

.

The so-called total staff control refers to the cost control involves the working process of all departments, teams and employees of the construction project department, and is related to the interests of each employee

.

Therefore, the cost control should fully mobilize the enthusiasm of each department, team and employee, and truly establish the concept of total staff control, instead of thinking that the cost control is only responsible for the budget, settlement and financial departments thing

.

The so-called whole process control refers to the whole cycle of the project and the whole process of the cost formation of the engineering construction project, starting from the construction preparation, through the construction process to the end of the warranty period after the completion and handover

.

Therefore, the project construction cost control work should be accompanied by each stage of the project construction

.

For example, the best construction scheme should be formulated in the construction preparation stage, the existing resources should be fully utilized in the construction stage according to the design requirements, and the construction cost should be reduced

.

In the project acceptance and handover stage, the project settlement should be handled in time, so as to make the project cost under effective control from beginning to end

.

3

.

The principle of target implementation

.

Target management is to realize the established target by planning, controlling, analyzing and assessing

.

It is the basic technology and method of enterprise management

.

In engineering construction, it is necessary to complete the task of cost control by implementing the construction stage objectives one by one

.

In the process of implementation, the goal setting should be practical and feasible, and should be implemented to departments, teams and even individuals; the goal responsibility should be comprehensive, and the cost responsibility should be highlighted; the responsibility, right and interest should be combined, and the performance of the responsible person should be evaluated, so as to achieve clear rewards and punishments

.

4

.

Dynamic control principle construction cost control is carried out in the changing environment, so we must adhere to the principle of dynamic control

.

The so-called dynamic control is to collect the actual value of the cost in time, compare it with the target value, and check whether there is deviation, so as to quickly find out the specific reasons and take corresponding measures

.

We should pay attention to “exception” in dynamic control

.

In the process of project implementation, the “exceptional” situation usually needs us to adopt flexible methods to deal with

.

For example, if the actual cost is too much lower than the standard cost, it may cause two situations: one is to bring adverse effects to the subsequent sub projects or operations; the other is to cause low quality, which may bring rework and increase warranty costs, and the quality cost control also affects the corporate reputation

.

Although some cost differences do not exceed the specified percentage or minimum amount, they are always hovering near the upper and lower limits of the control line, which should also be regarded as “exceptions”

.

It means that the original cost forecast may not be accurate and should be adjusted in time according to the actual situation

.

Founded in October 2016, the company is committed to computer software development and engineering cost consulting, mainly providing computer software services and technical consulting for various engineering enterprises

.

The company’s R & D goal is to develop all kinds of system software customization in the engineering field, focusing on automatic office and its derivative application fields

.

Zhongfan information currently has its own MIS information management system for engineering enterprises, as well as the Internet platform for project cost

.

Internet business includes responsive website construction, APP construction, wechat platform construction, and small program construction

.

Since its establishment, with the core idea of “quality first, quality service”, Zhongfan information has served all kinds of enterprises and institutions and won the trust and recognition of enterprise customers in the engineering field

.

The era of information automation has come, and the rapid development of intelligence has not only changed life, but also explored a new field for the development of society and enterprises

.

In this era of opportunities and challenges, Zhongfan information will rely on the power of science and technology, constantly improve its technology, improve its system more humanized, create a high-quality platform for Zhongfan people, let employees fully show themselves, release their dreams, share the same ideals, go hand in hand, let enterprises and employees grow together, develop together, and strive to create a higher quality product for the society Products and services

.

The company specializes in construction, power, municipal, water conservancy, landscaping, coal mine and decoration project cost, contract, data management, legal consultation and other services

.

To provide the construction units and construction enterprises at all levels with bidding quotation preparation, project contract review, completion data sorting, construction cost management in the whole process, project completion settlement declaration and tracking check work, settlement disputes and other services, to provide enterprises at all levels with comprehensive business planning scheme

.

Our company adheres to the service concept of “being entrusted by others, being loyal to others”; in line with the practice concept of “loyalty, dedication, preciseness and seriousness”, undertakes all kinds of business, always strictly abides by the national laws, decrees and regulations, strictly abides by the principles of “independence, objectivity, impartiality, truth and confidentiality”, and earnestly performs the obligations specified in the power of attorney

.

Company name: Shaanxi Zhongfan Information Technology Co., Ltd, Ltd company address: Qujiang office, block C, Liren Science Park, No.52, Gaoxin 6 road, Zhangba Street office, high tech Zone, Xi’an City address: room 103, unit 2, Qujiang bashui, Zhangba East Road / room 0804, building 4, Zhuque residence Tel: 18829582808 / 18816582808 Tel: 029-85795828-801 / 802email: sxzfxxkj@163.com Scan the two-dimensional code to add WeChat official account: information in the van / fan cost consultation.

.