5.
After the water and electricity renovation, we started the waterproofing process.
Remember to apply waterproofing in these areas multiple times for more safety.
2.
4.
3.
After filling the gaps, waterproofing can be applied.
Before waterproofing, it is important to ensure that the ground and walls are level and free from sand and hollowing.
This project is very important, but in terms of construction, it is still relatively simple! How can we really prevent water leakage? The following steps require strict attention.
In order to avoid water accumulation in the corners of the wall in the future, the cement mortar should be higher than the ground.
If any copyright is involved, please contact us to delete the text| Prepared by: Yang Baomin, Liu Ronghua | Checked by: Peng Liyun | Artistic Editor: Yang Baomin, Liu Ronghua
.
Generally, it is necessary to apply waterproofing to the bathroom at least twice in order to meet the thickness requirement, and it is necessary to evenly apply waterproofing every time; Two coats should be applied alternately vertically and horizontally, so as not to cause water leakage.
When doing the second waterproof layer, it is important to note that the plain mortar must be non sticky before applying the mortar layer* Declaration: This image and text are sourced from the internet and the copyright belongs to the original author.
If the proportion is not evenly matched, it will not have a good waterproof effect.
The common places we use for waterproofing include bathrooms, kitchens, and balconies.
1.
When decorating, it is necessary to mix and match the waterproof coating reasonably according to the construction requirements.