Creating a new height for cantilever steel pipe scaffolding construction: professional solutions, leading the industry’s new trends!

China Construction First Bureau (Group) Co., Ltd. xxxx Engineering Project Department.

.

.

.

.

.

Notice of the General Office of the Ministry of Housing and Urban Rural Development on the Implementation of the Safety Management Regulations for Sub projects with High Risks.

.

Notice on Strengthening the Construction Technology Management of Housing Construction and Municipal Infrastructure Engineering.

.

.

Standardization Management Manual of China Construction First Engineering Group Fifth Construction Co., Ltd.

.

Regulations on Construction Management of Hazardous Sub projects of China Construction First Engineering Group Fifth Construction Co., Ltd.

.

.

.

The construction period of this project is tight and there are many structural changes. The construction plan should be optimized as much as possible, and the most economical and reasonable frame type should be selected to provide assurance for the construction period..

Swivel Clamp Scaffolding

The structural design of scaffolding should ensure structural safety and reliability, and the cost should be economically reasonable. Under specified conditions and within the specified service life, it can fully meet the expected safety and durability. When selecting materials, strive to achieve common and universal use, recyclability, and ease of maintenance and repair. When selecting the structure, efforts should be made to achieve a reasonable structure, clear stress, convenient erection and dismantling, and easy inspection and acceptance..

To meet the construction requirements of the main structure, the above ground scaffolding of this project adopts a combination of floor double row scaffolding and cantilever scaffolding. Please refer to the “Construction Plan for Floor Scaffolding” for the details of the floor scaffolding section..

Summary of Scaffold Selection Table 2-2.

(-0.6m to 25.2m).

Note: For specific arrangements, please refer to the attached drawings “F1-F6 Scaffold Layout Plan”, “1-1 Section”, and “2-2 Section”..

(25.2m to 29.1m).

Note: For specific arrangements, please refer to the attached drawings “F7-F11 Scaffold Layout Plan”, “1-1 Section”, and “2-2 Section”..

Note: For specific arrangements, please refer to the attached drawings “F12-F15 Scaffold Layout Plan”, “1-1 Section”, and “2-2 Section”..

Note: For specific arrangements, please refer to the attached drawings “F16 Roof Scaffolding Layout Plan”, “1-1 Section”, and “2-2 Section”..

The technical department carefully familiarizes itself with the drawings and prepares the construction plan based on the on-site progress, ensuring that the plan is practical, feasible, and effective..

Carry out step-by-step disclosure, and the project chief engineer conducts scheme disclosure to project management personnel and key management personnel of the construction team. Professional foremen in writing and in meetings.