Preparation: if Sanxin curtain wall and Zhulong forum have infringement, please contact to delete 1
.
Qualification 2
.
Materials not required to be submitted for inspection 3
.
Materials required to be submitted for inspection 4
.
Materials required to enter the site 5
.
Erection personnel 6
.
Scaffold erection 7
.
Scaffold demolition 8
.
Common violation legend 9
.
Conclusion this detailed rules is compiled in combination with the company’s own situation and curtain wall construction characteristics
.
When erecting / dismantling, the construction must be carried out in strict accordance with the technical code for safety of fastener type steel pipe scaffold in building construction (jgj130-2011) and the scaffold erection / dismantling scheme
.
Safety management standard of scaffold (attached at the end of the paper)
.