1、 The formwork and scaffold engineering scheme must have feasible and effective construction drawings: plan, elevation (profile) drawing and detailed structure drawing.
cuplock scaffolding bottom cup
Before the removal of formwork support, the concrete strength shall be reviewed and approval procedures shall be handled.
.