Construction model of HVAC installation engineering

Refrigeration room part: 1, refrigeration room and supporting water pump installation

.

2

.

For the installation of refrigeration unit, refrigeration and cooling water pipes, pay attention to the ceiling in the machine room

.

3

.

Installation of water pump for refrigeration unit 4

.

Installation of water inlet and outlet pipe of refrigeration unit and water pump

.

5

.

Water pump integration (supporting valves, filters, flexible joints, pressure gauges, thermometers, etc.) construction boiler room part: 1

.

Boiler equipment supporting installation of gas pipelines; 2

.

Boiler supporting installation of gas pipelines, hot water pipes, etc.; 3

.

Boiler supporting installation of gas, water pipes and chimneys, etc

.

4

.

Please pay attention to the height of the boiler room

.

Air conditioning room: 1

.

Water in and out of the air conditioning box unit, condensate water drainage, bypass pipe, etc

.

2

.

One pipe is covered with iron sheet, and the other one is not, which is a little regretful in perfection

.

3

.

This one is better than the last one

.

4

.

Although it is not installed in the air conditioning room, it has revealed a semi integrated form

.

5

.

You can have a panoramic view of the air pipes and water pipes

.

Board room: 1, please ignore the refrigeration unit, Kanban change

.

2

.

Change the unit of Kanban in the crevice

.

3

.

It’s really beautiful

.

4

.

The valve should also be packed, which will be more perfect

.

5

.

Clean up the computer room so that you can see people

.

Fan room: 1

.

It’s not bad, but there is no outstanding performance on the ground

.

2

.

Epoxy paint, logo and so on, immediately feel different

.

Review in the past, click the link to get more operation and maintenance learning materials, white paper on intelligent operation and maintenance of data center infrastructure, free access to data center infrastructure operation and maintenance materials, interpretation of T / cecs761-2020 “data center operation and maintenance and management standards”

.