Bored pile construction process 3D animation, after watching you are the old driver!

The following 3D construction animation reproduces the whole construction process of cast-in-place bored pile, including construction preparation, survey and setting out, steel casing embedding, mud pit layout, drilling in place, drilling, hole forming inspection, hole cleaning, reinforcement cage production and hoisting, pile head reinforcement installation, composite isolation casing, pipe installation, secondary hole cleaning, underwater concrete pouring, pulling out pipe and steel casing, and overall pile breaking Pile head, pile head reinforcement bending, pile quality inspection and other construction processes, it is worth collecting and learning

.

(it is recommended to watch it on WiFi) video: the screenshot of bid VIII of Xuyan railway of China Railway Fourth Engineering Group Co., Ltd

.

is the first to watch the selected micro signals of several buildings

.

It is recommended that you long press the identification QR code to join.

.