You must know that waterproof layer is very important for epoxy floor construction

For the rainy and humid South, waterproof layer is essential, which is related to the overall quality of the project

.

Waterproof layer has a very important influence on the service life of epoxy floor, especially the epoxy floor system of basement and first floor

.

If the waterproof layer is not well done, the later stage of the floor is prone to bubble, delamination and other phenomena

.

Before the construction of waterproof layer, it is necessary to deal with the base surface to ensure that the moisture content is below 4%

.

If the ground is too wet, you can use the method of blast or sunlight to speed up the drying of the ground

.

Generally, the drying time of base course is more than 28 days

.

After the base surface is treated, the construction of waterproof layer can be started

.

The construction of waterproof layer generally has two situations: the first is to lay fine sand; the second is to lay plastic film, which should be carried out after the ground is backfilled

.

First, a layer of fine sand should be laid on the surface of the backfill, followed by asphalt felt and plastic film, both of which should be opaque

.

Finally, the concrete layer is poured

.

At least 10cm overlapped waterproof coating is required at the lap joint of two plastic films

.

The waterproof coating is a kind of viscous liquid brushed on the building surface

.

The liquid will form a layer of film through the volatilization of solvent or water, or the chemical reaction of two components

.

This film insulates the surface of the building from water, thus playing the role of waterproof and sealing

.

1

.

First, a layer of waterproof coating is applied on the cement floor of epoxy floor paint construction to form a waterproof isolation layer

.

2

.

Then the cement mortar protective layer is laid

.

The construction of epoxy floor paint is carried out on the protective layer of cement mortar

.

In order to get a high quality epoxy floor, the construction of waterproof layer is an essential process

.

If you wait until there is a problem to realize the importance of waterproof layer, it is really only regret

.

Disclaimer: the content is from the Internet and the industry, and the official account of WeChat official account

.

We are neutral to the viewpoint

.

The views in this article do not represent the public opinion

.

All articles are for reference only and for the purpose of communication.

.