Construction site management

Sanitation and epidemic prevention on construction site (1) dormitory on site must be equipped with openable windows, the number of beds in the dormitory shall not exceed 2 floors, and it is strictly forbidden to use the full berth; sufficient space shall be ensured in the dormitory on site, the indoor clear height shall not be less than 2.5m, the channel width shall not be less than 0.9m, and the number of residents in each dormitory shall not exceed 16

.

(2) On site canteen: it shall be set far away from the toilet, garbage station, toxic and harmful places and other pollution sources; independent production room and storage room shall be set up; rat proof baffle no less than 0.2m shall be set under the door leaf, and necessary ventilation facilities and refrigeration facilities shall be provided; storage room for gas tank shall be set up separately, and the storage room shall be well ventilated and other articles shall not be stored; Health permission must be obtained Cooks must hold health certificates

.

The control points of on-site civilized construction management (1) the project overview Board shall be set at the obvious entrance and exit of the construction site, and the general layout of the construction site, the system board of safety production, fire protection, environmental protection, civilized construction and management personnel list and supervision telephone board shall be set in the gate

.

(2) The construction site must be closed and managed

.

The entrance and exit of the site must be equipped with guard room

.

The enclosure must be solid, clean and beautiful, and set continuously around the site

.

The enclosure height of general road sections shall not be less than 1.8m, and that of main urban road sections shall not be less than 2.5m

.

(3) The construction area of the construction site shall be clearly separated from the office and living areas, and corresponding isolation and protection measures shall be taken

.

No one is allowed to live in the project under construction

.

(4) Special fire water source and fire standpipe shall be set in high-rise buildings, and fire water source interface shall be set in each floor

.

The basic regulations of labor employment (1) all labor service enterprises engaged in construction engineering labor activities must obtain the corresponding construction labor enterprise qualification, and engage in construction engineering labor activities within the scope of the qualification certificate

.

(2) Labor service enterprises must use their own labor workers to complete the labor work they undertake, and shall not subcontract or subcontract the labor work to the individual labor team or “labor contractor” without qualification, self owned team or construction ability

.

(3) When the general contracting enterprises or professional contracting enterprises pay the labor subcontracting funds of the labor service enterprises, they should instruct special personnel to supervise the labor service enterprises to pay the wages directly to the migrant workers themselves

.

It is strictly forbidden to pay the wages to the “Contractor” or let the “Contractor” collect the wages for several migrant workers, so as to avoid the situation that the “Contractor” absconds with the funds and the migrant workers’ wages are in arrears

.

Main measures of real name management of labor service (1) general contracting enterprises, project management departments and labor sub contracting units must set up labor service management organizations and labor service administrators respectively according to regulations, and formulate labor service management system

.

(2) Before entering the construction site, the labor workers of the labor subcontractor shall submit the roster, ID card, labor contract text and copies of post skill certificate of the construction workers to the general contractor for record according to the real name system management requirements

.

Key points of construction general plan design (1) set up gates (more than two) and lead them into off-site roads

.

(2) Layout of warehouse and storage yard: close to the place of use, its longitudinal direction should be parallel to the traffic line, and the on-site facilities should be used for unloading as far as possible; the warehouse that takes a long time to load and unload goods should be far away from the roadside

.

(3) Layout of processing plants: minimize the transportation volume of materials and components, and make vertical transportation equipment play a greater role; relevant processing plants should be appropriately concentrated

.

(4) Arrange temporary transportation roads in the site: the main roads shall be hardened, and the width of main roads shall not be less than 4m for one-way roads and 6m for two-way roads

.

There should be 6m wide passageway on both sides of the timber yard, 12m × 12m return yard at the end, the fire lane should not be less than 4m, and the turning radius of trucks should not be less than 15m

.

(5) Arrange temporary water, electricity pipe network and other power facilities: temporary pool and water tower should be set in the water center and higher terrain

.

The pipe network is generally arranged along the road

.

The power supply line should not be set on the same side as other pipelines

.

Meanwhile, the branch line should be led to the place where all electrical equipment is used

.

The platform provides the most comprehensive and professional (constructor, cost, supervision, fire control, injection safety, consulting) guidance materials every year: 1

.

Examination materials, exercises and real papers of various subjects in 2021

.

2

.

In 2021, there will be 50 public courses and 100 practical courses in all subjects and major online schools (globegroup, hixue, construction engineering, 233, Zhongye, Dali, Youlu, etc.), including intensive lecture course, sprint course, quiz course, pre exam simulation paper, quiz paper and the last three pages..

.