Shenzhen decoration reveals 8 details of Shenzhen Jingzhi decoration hydropower construction

Jingzhi decoration project is the most important part in the decoration process, and hydropower project is the most important part of the hidden project

.

Because the hidden project is often covered by the later process, it is difficult to find whether it is completely qualified after decoration

.

It can be said that the quality of the hidden project decoration is closely related to the comfort of the owner’s life Relationship

.

So it is very important to know the details of hydropower construction

.

Next, let’s introduce the eight details of Jingzhi decoration hydropower construction

.

The decoration Xiaobai uses a small notebook to remember that there are “three lines” on the wall of the living room

.

The switch line is 1.3 m high, the horizontal line is 1 m high, and the socket line is 0.3 m high, so as to ensure the unified height of lighting switch and socket

.

02part is pasted with water and electricity direction marking belt to prevent the later installation of cupboards, bath cabinets, hardware and other nailing holes from inadvertently threading pipes and water pipes

.

The direction of 03part water and electricity pipe should be horizontal and vertical, and there should be a gap between the pipe and the pipe, so that the cement mortar can enter into the pipe when laying the floor tile, and prevent the floor tile from hollowing later

.

04part water way ceiling in Jingzhi decoration hydropower project, the water way is ceiling, which can avoid water leakage caused by water pipe burst due to slight vibration of the house

.

At the same time, once the water leakage occurs, it can be found by the owner in time

.

The most important point is that the owner and maintenance workers can quickly and easily find the water leakage, and thoroughly control the water leakage The solution is given to reduce the loss to the owner caused by water leakage

.

(PS: now add wechat: 15323453559, you can provide multiple sets of similar vr-3d renderings for free according to your house type for reference!) 05part pipe clamp is used to fix the water and electricity pipe, which is fixed with stainless steel pipe clamp to prevent the later rust and fracture of iron material

.

06part tin foil paper is used to wrap the weak wire

.

The strong and weak tubes are arranged in slots, boxes and branches

.

The strong and weak tubes at the junction of strong and weak current are wrapped with tin foil paper

.

The edges of the junction extend 20 cm from left to right, and the ends are neat and smooth

.

Damage and looseness are strictly prohibited

.

At the same time, the junction of strong and weak current tubes is wrapped with tin foil paper to prevent the radiation of strong current in the process of use Interference, reduce the function of weak current, cause signal interference

.

07part line pipe and bottom box are connected by cup comb

.

The line pipe and bottom box are firmly connected by cup comb without looseness

.

The pipe joints are connected by special glue or hot-melt technology to prevent the wire from being scratched and damaged in the process of threading, and the cement mortar overflows to pollute the inside of bottom box in the process of slot patching

.

08part strong and weak wire ends are connected with Wago connector-

.