New Beijing Tangshan railway station building and related projects Bidding conditions: the new Beijing Tangshan railway of the construction project has been approved by the national development and Reform Commission with the reply of the national development and Reform Commission on the approval of the new Beijing Tangshan railway [2016] No
.
2129, The owner of the project is Jingtang Intercity Railway Co., Ltd., and the construction fund comes from Beijing Tianjin Hebei Intercity Railway Investment Co., Ltd
.
and domestic bank loan
.
The proportion of project investment is 50% of Beijing Tianjin Hebei Intercity Railway Investment Co., Ltd., and 50% of domestic bank loan is Jingtang Intercity Railway Co., Ltd
.
The total price contract of the new Beijing Tangshan railway station building and related projects, production and living houses and other projects of this bidding project has met the bidding conditions
.
Now the public bidding is carried out, and the prospective bidders (hereinafter referred to as the applicants) are invited to apply for prequalification
.
2
.
Project overview and bidding scope project overview: construction scale: 138007.66 square meters
.
The line starts from the new Beijing Sub central station and ends at the existing Tangshan station in Tangshan City, Hebei Province, passing through Tongzhou District of Beijing, Langfang city of Hebei Province (Yanjiao Town, Dachang county and Xianghe County of Sanhe City), Baodi District of Tianjin city and Tangshan city of Hebei Province (Yutian County, Fengrun District, hi tech district and Lubei District)
.
The project mileage of Beijing Tangshan railway (excluding the sub central section of Beijing City): dk27 + 350 to dk261 + 701.130
.
The construction scope includes five station buildings and related projects of Dachang station, Xianghe station, Baodi south station, yahongqiao station and Tangshan airport station; Dachang EMU station, Baodi South maintenance workshop, Dachang, Xianghe, yahongqiao, Tangshan depot maintenance area, Tangshan airport station duty point and other production and living houses and related supporting projects are as follows: (1) Dachang station building and related projects: the center mileage of Dachang station is changed to dk47 + 770, the maximum number of people gathered is 900, and the construction area is 9996 m2
.
One 450m-u00d78.0m-u00d71.25m basic platform and one side intermediate platform are set respectively, and one 8.0m-wide passenger underpass is set at the center of the station
.
The canopy is the same length as the platform( 2) Xianghe station building and related projects: the center mileage of Xianghe station is dk72 + 368, the maximum number of people gathered is 900, and it is an offline station building with a building area of 9683 m2
.
There are two 450-u00d712.0-u00d71.25m island type intermediate platforms, one 450-u00d78.0-u00d71.25m basic platform and one side type intermediate platform, and one 12.0m wide passenger underpass
.
The canopy is the same length as the platform( 3) Baodi south station building and related projects: the center mileage of Baodi south station is dk94 + 842, the maximum number of people gathered is 1500, which is an offline station building with a building area of 15973 m2
.
Two 450m-u00d712.0m-u00d71.25m island type intermediate platforms and two 450m-u00d78.0m-u00d71.25m side type intermediate platforms are set
.
The span of platform beam is 32m, and one 12.0m wide passenger passage is set at the center of the station
.
The canopy is the same length as the platform\ N (4) yahongqiao station building and related projects: the center mileage of yahongqiao station is changed to dk141 + 400, the maximum number of people gathered is 400, and it is a station building under the line, with a construction area of 9986 m2
.
One 450m-u00d78.0m-u00d71.25m basic platform and one side intermediate platform are set respectively, and one 8.0m-wide passenger underpass is set at the center of the station
.
The canopy is the same length as the platform( 5) Tangshan airport station building and related projects: the center mileage of Tangshan airport station is dk159 + 410, the maximum number of people gathered is 500, and it is an offline station building with a construction area of 16223 m2
.
Two 450-m island type intermediate platforms and two 8.0m-wide passenger underpasses are set
.
The canopy is the same length as the platform( 6) One maintenance workshop (including the work area of the line) is set up in the south of Baodi for the production and living house project; In Dachang and yahongqiao, there are two working areas with wiring; One working area without wiring is set in Xianghe, Dachang EMU station and Tangshan depot respectively; One duty point is set at Tangshan airport station
.
The project is equipped with Baodi South maintenance workshop, Dachang, Xianghe, yahongqiao, Tangshan depot, Dachang EMU Depot Maintenance Area and Tangshan airport station duty point and other production and living houses
.
The main project contents include: Dachang EMU Depot six line inspection depot, Dachang EMU Depot temporary repair not falling wheel depot and various supporting houses and related supporting projects
.
The planned construction period is 471 days, the commencement date is June 16, 2021, and the completion date is September 30, 2022
.
The scope and contents of the bidding are as follows: 1) station building and related projects (1) Dachang station building and related projects( 2) Xianghe station building and related projects( 3) Baodi south station building and related projects( 4) Yahongqiao station building and related works( 5) Tangshan airport station building and related projects
.
2 production and living houses and related projects (1) Langfang section: Dachang station, Xianghe station area and work area production and living houses project; Production and living houses and related projects of Dachang EMU Operation Station( 2) Tianjin Section: Baodi South Station area production and living houses, maintenance workshop (including Jingtang work area and Jingbin work area) production and living houses and related projects( 3) Tangshan section: yahongqiao station, Tangshan Airport Station area and work area production and living housing project; Tangshan Airport Station EMU Depot (including work area) production and living houses and related projects
.
Bid section division: this bidding is divided into three bid sections, bid section No.: jtzf-1, jtzf-2, jtzf-3, 2.1jtzf-1, project quantity: building area: about 33527.93 square meters, Mileage / scope: 1
.
Tangshan airport station building and related projects 2
.
Xianghe station building and related projects 3
.
Production and living housing project (1) Tangshan Airport Station area production and living housing and related projects (2) Xianghe station area and work area production and living housing project (3) Tangshan airport station mobile parking lot (including work area) production and living housing and related projects
.
2.2jtzf-2, project quantity: building area: about 27261.41 square meters, mileage / scope: 1
.
Baodi south station building and related works 2
.
Production and living house works (1) Baodi South Station area production and living house and related works (2) Baodi south station maintenance workshop production and living house and related works
.
2.3jtzf-3, project quantity: building area: about 77218.32 square meters, mileage / scope: 1
.
Yahongqiao station building and related projects 2
.
Dachang station building and related projects 3
.
Production and living housing project (1) yahongqiao station area Work area production and living houses and related projects (2) Dachang station area and work area production and living houses project 4
.
Dachang EMU Operation Station (including work area) production and living houses and related projects..
.