Tianjin: closed construction, pay attention to detour!

   Since April 20, due to the new bridge construction of tiedongbei Road, the main road and some auxiliary roads of tiedongbei Road (from chentai bridge to Beixin bridge) have been closed in stages, with a construction period of about one year

.

During the construction period, the speed limit of motor vehicles is 30 km / h

.

The traffic police detachment of Beichen branch of Public Security Bureau, combined with the actual traffic situation in recent days, gave another prompt to the scene traffic

.

First, at the Beixin bridge of tiedongbei road and the lower bridge of chentai bridge, the setting status of motor vehicle lanes is gradually decreasing and merging into the auxiliary road, and the motor vehicles passing through here should reasonably control the speed and safety distance and merge into the new guide road according to the newly clearly drawn road markings; Second, vehicles are not allowed to park in the whole section of the auxiliary road of tiedongbei Road (chentai bridge to Beixin bridge section); Third, motor vehicle drivers, non motor vehicles and pedestrians entering the construction area should pay attention to the traffic signs and warning signs

.

In case of traffic congestion, they should consciously obey the on-site guidance and command of the police on duty, drive carefully and drive safely

.

Source: Tianjin traffic police Click to watch the video demo 👇 click

.