Explanation and examples of filling in “construction quality evaluation form of divisional works”

Click on the blue words above to pay attention to the construction quality assessment form of divisional works

.

When filling in the form, we must abide by the “basic rules for filling in the form”, and meet the following requirements: 1

.

This form is the unified format of the construction quality assessment form of divisional works of water conservancy and hydropower projects (including embankment projects)

.

2

.

Quantities of divisional works, only the main quantities of the divisional works shall be filled in

.

3

.

The type of unit project shall be filled in according to the type of unit project in the evaluation standard, such as geotechnical excavation, concrete, etc

.

Number of 4 unit projects: refers to the sum of general unit projects, main unit projects, important concealed projects and key parts of unit projects

.

5 qualified number: refers to the total number of unit project quality reaching the qualified and above quality level

.

6

.

Main unit works, important concealed works and key parts of the project: ① main unit works: limited to the unit works marked with “△” in the division table of unit works in the evaluation standard

.

② Important concealed works: concealed works generally refer to foundation works, foundation excavation, foundation treatment, underground anti-seepage, foundation drainage, underground building works, etc., which are covered after completion and cannot or is difficult to be inspected again

.

Important concealed works refer to the concealed works that seriously affect the safety and use function of the main buildings

.

③ Key parts of the project: the parts that have a significant impact on the safety or benefit of the project

.

Important concealed works and key parts of the project shall be determined during project division

.

7 the form from the header to the self-evaluation opinions of the construction unit shall be filled in by the quality inspection department of the construction unit, and the quality grade shall be self evaluated

.

The assessor refers to the person in charge of quality inspection

.

8

.

The review opinion column of the supervision unit shall be filled in by the supervision engineer in charge of the quality control of the divisional project, and then submitted to the director or the representative of the director for review and signature, with official seal

.

9

.

In the column of quality supervision organization, after the auditor signs the audit opinions, the auditor and the person in charge sign and seal

.

If you have no opinion, you can fill in “agree to review”

.

For the projects with large quantities, the quality of raw materials, intermediate products and metal structure installation should be evaluated in the divisional projects

.

11

.

When evaluating the quality grade of the installation divisional works of water turbine generator set, the models of water turbine, generator and Governor shall be filled in the remarks column

.

12 quality evaluation standards for divisional works: all the quality of the unit works are qualified

.

The quality accidents and defects have been dealt with according to the requirements and passed the inspection; The quality of raw materials, intermediate products and concrete (mortar) specimens are all qualified, the manufacturing quality of metal structure and hoist is qualified, and the quality of mechanical and electrical products is qualified

.

Excellent standard: the quality of all the unit projects is qualified, and more than 70% of them are excellent

.

The excellent rate of the important concealed unit projects and the key parts of the unit projects is more than 90%, and there is no quality accident; The quality of intermediate products is all qualified, and the quality of concrete (mortar) specimens is excellent (when the number of specimens is less than 30, the quality of specimens is qualified)

.

Raw material quality, metal structure and hoist manufacturing quality are qualified, and mechanical and electrical products are qualified

.

13

.

According to the order No

.

49 of the Ministry of water resources on December 22, 2017, the decision of the Ministry of water resources on Abolishing and modifying some rules and regulations, the regulations on acceptance management of water conservancy construction projects (Order No

.

30 of the Ministry of water resources on December 18, 2006, and order No

.

46 of the Ministry of water resources on August 19, 2014) were revised, Article 16 of order No

.

48 of the Ministry of water resources on August 1, 2016 (the second revision) is revised as: “after the acceptance of the legal person, the conclusion of quality assessment shall be submitted to the quality supervision organization of the project for approval

.

If it has not been approved, it shall not organize the next stage of acceptance

.

” Therefore, the conclusion of construction quality evaluation of divisional works is changed to “report to quality supervision organization for approval”

.

Don’t just look at the examples, just press and focus! You’d better watch one by one.

.