Ningxia road construction detour information!

Ningxia people’s point above (free subscription) regional road condition information 2021.4.30 from April 30, 2021 to May 7, 2021, part of the roads in the region were under construction

.

During the construction period, traffic control was carried out on the following sections

.

Please plan the travel route in advance, slow down or detour in advance according to the prompt signs

.

The entrance and exit of Mengjiawan toll station was closed due to road safety hazards

.

2

.

From September 25, 2020 to July 12, 2021, the road surface subsidence, subgrade slope, tunnel entrance and exit treatment, safety facilities maintenance and other construction of the section from K0 + 000 to K46 + 525 of Guxi expressway will be carried out, and large vehicles will bypass S101 and X401

.

From February 2, 2021 to June 30, 2021, the section of Chaoyang Lane (Xinhua Street to Renyi Lane) in Xingqing District was completely closed

.

2

.

From December 31, 2020 to October 31, 2021, the road traffic of Deshui Road (Xihua street to Jiangjun Street) in Xingqing District will be completely closed

.

3

.

From April 26, 2021 to May 21, 2021, the road traffic of Youai Central Road (Guoshang South Road to Haibao Road) in Xingqing District will be semi closed

.

4

.

From March 28, 2021 to May 16, 2021, the road traffic of Tabai Road (from changta road to Tiandiyuan flower logistics center) in Xingqing District will be semi closed

.

5

.

From April 5, 2021 to May 5, 2021, the non motorized lane at the northeast corner of the intersection of Beijing Road and Youai Central Road in Xingqing District will be semi closed

.

6

.

From April 25, 2021 to June 13, 2021, the non motor vehicle lane on the south side of Helanshan Road (Tianping street to Minzu Street) in Xingqing District will be fully closed

.

7

.

From May 6, 2021 to July 15, 2021, Jinshuiyuan bridge of c505 line (K0 + 000 to K0 + 348) was repaired and reinforced, and the road traffic was semi closed

.

8

.

From April 28, 2021 to May 18, 2021, the North motor vehicle lane 200 meters east of the intersection of Qinghe street and Zhiping road will be semi closed

.

9

.

From April 28, 2021 to May 20, 2021, the traffic of the West motor vehicle lane 150 meters south of the intersection of Jingjiu Road (wuyuehefu front road) and Wuming Road (wuyuehefu North Road) will be semi closed

.

10

.

From April 28, 2021 to May 8, 2021, the motor vehicle lane 150 meters north of the intersection of Zhongfa street and Xinhua East Road will be semi closed

.

11

.

From April 30, 2021 to May 18, 2021, semi close the South motorway 50 meters east of the intersection of Haibao road and Youai central road

.

12

.

From May 1, 2021 to May 5, 2021, semi close the South motorway 10 meters east of the intersection of Haiyi lane and Tianping street

.

Jinfeng District 1

.

From May 1, 2021 to May 23, 2021, the traffic on the East and West non motorized lanes of Caiyun street and Liupanshan Road 300 meters south will be completely closed

.

2

.

From April 30, 2021 to May 15, 2021, the traffic on the south side of the motorway 470 meters east of the intersection of Xiangcong road and Zhengyuan South Street will be semi closed

.

Xixia District 1

.

From April 30, 2021 to May 31, 2021, the road traffic of G110 line (from Nuanquan to zhenbeibao) will be completely closed

.

2

.

From April 5, 2021 to May 15, 2021, the road traffic of the original yinba Road (g110k1356 + 588 to k1371 + 239 at the junction of Ningxia and Inner Mongolia) section of G307 National Highway in Xixia district was completely closed

.

3

.

From April 24, 2021 to May 15, 2021, the traffic on the east side of Tongxin North Street (Xueyuan Road to Shenyang Road) in Xixia district will be semi closed

.

4

.

From April 30, 2021 to May 10, 2021, the road section of No

.

6 Road (Xueyuan Road to No

.

4 road) on the west side of area C of Jianfa Xingzhou garden in Xixia district will be semi closed

.

5

.

From April 25, 2021 to May 14, 2021, the non motor vehicle lane on the northwest side of the intersection of Wencui South Street and Huanghe West Road in Xixia district will be semi closed

.

From April 10, 2021 to July 9, 2021 in Lingwu, the road traffic was semi closed due to the construction of pavement maintenance project of national highway G244 (k144 + 282 to k151 + 468) in Ningdong Town, Lingwu City

.

From April 10, 2021 to July 9, 2021, the road traffic of g109 National Highway (from k1242 + 760 of Yongning railway station to k1254 + 560 of Rencun) in Yongning County was semi closed (large trucks passing through Yongning railway station to Yesheng direction were bypassed by G6 Beijing Tibet expressway, and small vehicles were bypassed by Binhe Avenue)

.

Shizuishan City 1

.

From November 15, 2019 to June 30, 2021, Xueyuan Road (Shahu avenue to shibazhiqu Road) will be completely closed for traffic control, bypassing Binhu road and Longhu Avenue

.

2

.

From December 25, 2020 to December 31, 2021, the section from rujigoukou to Baijigou of provincial highway 303 will be completely closed for traffic control and detour( 3

.

From January 7, 2021 to December 31, 2021, semi closed traffic control will be carried out on the section from rujigoukou to Baijigou of provincial highway 303( 4

.

From March 15, 2021 to May 20, 2021, the Huanghe Street (from Helanshan road to Wenming Road, Yongkang road to Shiji Avenue) will be fully closed; From May 20, 2021 to July 19, 2021, the non motorized lane of Huanghe Street (Wenming road to Qianjin Road) will be completely closed; From June 20, 2021 to August 20, 2021, Huanghe Street (Qianjin Road to Yongkang Road) is closed to all non motorized lanes

.

5

.

From April 1, 2021 to August 30, 2021, the pedestrian street (from Huian street to North Street) and postal Road (from Desheng road to North Street) shall be subject to closed traffic control

.

6

.

From April 1, 2021 to August 30, 2021, the postal Road (North Street to Desheng Road) and the pedestrian street (North Street to Hui’an Street) will be completely closed for traffic control

.

7

.

From April 1, 2021 to August 30, 2021, Guangdong Road and Chunhui South Road will be closed to traffic control

.

8

.

From April 10, 2021 to June 10, 2021, the traffic control of Jianshe Street (from Taiwan Road to Yumin Road) will be completely closed

.

9

.

From April 10, 2021 to June 10, 2021, Helanshan Road (Jianshe street to Shengli Street) will be completely closed for traffic control

.

10

.

From April 10, 2021 to June 10, 2021, the traffic control of Jianshe Street (Yumin Road to Helanshan Road) will be completely closed

.

11

.

From April 10, 2021 to June 10, 2021, the traffic control of Jianshe Street (from Helanshan road to Qianjin Road) will be completely closed

.

12

.

From April 8, 2021 to May 31, 2021, Xueyuan Road (Xingguang avenue to Shanshui Avenue) will be closed to traffic.

.