Epoxy floor construction 18603414081

For 14 years, we focus on R & D, production, sales and construction of epoxy floor coatings

.

Advanced construction equipment, products are non-toxic, wearable, sealed, dustproof and anti-aging

.

Welcome new and old customers to call 18603414081 as owners

.

You need to consider what kind of environment the floor will be built: indoors or outdoors

.

Traffic frequency and load? Required cleanliness? What is the ambient temperature and humidity? Anti static and anti-corrosion requirements? In response to these requirements, we will provide you with professional and high-quality personalized customized solutions and services

.

Construction process: 1

.

Base surface inspection and repair: the new cement can not be constructed and needs to be cured for 30 days, because the cement contains moisture and chemical composition, alkali will react with the paint, causing the paint bulge and peeling

.

Epoxy floor construction is not allowed when there is water, moisture and oil on the ground

.

If there are potholes and cracks on the ground, epoxy mortar can be used to repair them

.

It is not recommended to repair them directly with cement

.

Take out the asphalt or soil in the expansion joint and clean it up

.

Fill the expansion joint with materials

.

After the ground is completely dry, grind the ground clean and finish the treatment of plain land

.

2

.

Ground grinding: grinding in the way of vertical and horizontal cross

.

Pay special attention to the corner of the wall must be ground in place

.

Then vacuum the floor

.

Its main function is to grind the tiny particles on the ground, expand the surface pores and facilitate the adsorption of epoxy resin

.

The main function of increasing the construction thickness of epoxy floor is pressure resistance and wear resistance, so as to prolong the service life

.

3

.

Epoxy resin primer Construction: the primer shall be measured with an electronic scale according to the ratio specified by the manufacturer

.

After mixing, it shall be fully stirred and then applied by scraping or rolling

.

The drying time is closely related to temperature and humidity

.

The temperature should be controlled at about 25 degrees

.

The next construction can be carried out after 24 hours

.

The purpose is to enhance the adhesion between the ground and the surface

.

In the process of epoxy primer construction, according to different foundation conditions, when the resin is adsorbed, appropriate amount of quartz powder is added to seal the surface pores

.

According to different surface hardness and pore diameter, the effect after construction is different

.

When the resin absorbs rapidly, the quartz powder remaining on the surface is loose and does not solidify, and the color is white

.

When the resin absorbed slowly, quartz powder and resin solidified

.

4

.

Epoxy mortar intermediate coating construction: epoxy intermediate coating is added with appropriate proportion of quartz sand, which is fully stirred by the machine, and then evenly scratched on the ground with a trowel to increase the flatness of the ground and the compressive strength of the coating

.

The next construction can be carried out 24 hours after the temperature is about 25 ℃

.

The resin grinding plate shall be used to grind the floor, which shall be basically flat without holes, knife marks and sand grinding marks

.

5

.

Two layers of top coat construction: keep clean before construction, and remove the sundries if they adhere

.

Before use, the main agent should be stirred evenly, the main agent and curing agent should be mixed according to the correct proportion, and thoroughly mixed

.

Apply the material evenly with the roller, and finish the mixed material construction within 30 minutes

.

After the completion of construction, people can get on after 24 hours, and heavy pressure can be carried out after 72 hours, subject to 25 ℃

.

The opening time at low temperature needs to be appropriately extended according to the situation

.

The main function of epoxy topcoat is color matching to make the floor beautiful and smooth

.

At the same time, the thickness of the floor is increased to make it more pressure resistant and worn, and the service time is prolonged

.

6

.

Roll coating wear-resistant varnish: roll coating a layer of wear-resistant varnish to improve the gloss of epoxy floor, enhance the hardness of paint film, and prolong the service life of epoxy floor..

.