Click the blue word above Lianzhou information Watch more Lianzhou news recently, with the completion of concrete pouring for the first pile foundation of Lianhe branch project of Er Guang expressway, the curtain of bridge pile foundation construction officially opened, marking that the project has entered the comprehensive construction stage
.
According to the ER Guang branch of Guangdong Road and bridge construction and Development Co., Ltd., the construction of Lianhe branch of Er Guang Expressway (Guangdong border section) will start at the end of 2020, and it is planned to be completed and opened to traffic by the end of 2023
.
The first pile foundation of the project is poured with concrete
.
According to Tian Zhao, the project starts from Futang Town, Lianshan Zhuang and Yao Autonomous County and ends at the boundary of Guangdong and Guangxi
.
It is a section of the connecting line between Guangdong Er Guang Expressway and Guangxi Yonghe expressway
.
The total length of the line is about 6.5 km, with two-way four lanes and a design speed of 100 km / h
.
It is equipped with 6 main bridges, 2 tunnels, 2 bridges and 2 bridges One interchange
.
As the branch line of Lianzhou HUAIJI section of Er Guang expressway, the project is an important inter provincial channel between Guangdong and Guangxi provinces The completed pile foundation is located at the 7-4 pier on the right side of the main line bridge of Futang interchange
.
It took 19 days from the opening of pile foundation to the completion of concrete pouring
.
The construction unit actively strengthened communication and coordination with Qingyuan City and Lianshan county governments, and made every effort to promote the land acquisition and demolition work along the line
.
In the process of construction management, the construction mode of permanent and temporary access roads is adopted, and the existing logging channels and tractor roads are fully used to enter the site for construction in advance, so as to open up more working faces as much as possible, creating favorable conditions for the overall construction of the project
.
According to the relevant person in charge of Er Guang expressway, as an important inter provincial channel connecting Guangdong and Guangxi, Lianhe branch line is an important measure to implement the decision and deployment of the provincial Party committee and the provincial government on further promoting the leapfrog development of mountainous areas in northern Guangdong, which will promote the economic interaction and coordinated development of Guangdong and Guangxi, and bring greater economic radiation effect, Driving the rapid development of tourism in northern Guangdong and Guangxi is of great significance to accelerate the high-quality development of ethnic minority areas【 Reporter] Chen Guofei [correspondent] Chen Bojun [picture and text] south + business promotion / contribution disclosure Please add micro signal 542271352 ↓ click below
.