Tianshui: closed construction! Take a detour

   Tips: click “Xihuang’s hometown” above to scroll up to browse the full text for free

.

Zhongtan connecting line is an important channel connecting Tianchan highway with Zhongtan interchange exit of Tianping expressway

.

At present, the subgrade construction has been completed, and the asphalt pavement construction is about to start

.

According to the construction needs, in order to ensure the construction and traffic safety, According to the road traffic safety law of the people’s Republic of China, it is decided to control the traffic during the construction period of the construction section

.

The relevant matters are hereby announced as follows: 1

.

The closed construction scope: 1

.

Zhongshi highway (from the starting point of Zhongtan connecting line to the head of Hulu River Bridge in Zhongtan town) is about 2 km

.

2

.

451 county road is 3km (Beiwan village houchuan Village section of Zhongshi highway)

.

2、 Closing time: 20:00, May 15, 2021 to 20:00, May 30, 2021

.

3、 Closure method: according to the requirements of traffic control, water horse and conical bucket closure are adopted for phased closure

.

4、 During the closure period, people and vehicles are requested to make a detour to ensure safety

.

Please understand the inconvenience caused by the construction

.

This is to inform the traffic police brigade of Maiji public security branch of the people’s Government of Zhongtan Town, Maiji district

.

The project office of pingtian Expressway (Tianshui section) of the Transportation Bureau of Maiji District came to the source on May 10, 2021

.

The traffic police of Maiji public security click “watching” below to let more people see it.

.