Having contacted friends in the construction industry, I learned that the best solution is to let the tower crane stay on the construction site without any treatment
.
At that time, I was confused when I heard that the price of tower crane was not cheap, so I left it on the construction site
.
Isn’t that a waste of resources? It is often heard that there are uncompleted projects in almost every city
.
When passing by, you can see the construction site, and all the things are left there waiting for rust without moving away
.
The main reasons for the construction site failure are as follows: 1
.
The developer’s overall movable funds are broken, new funds are not in place, and there is no financing in other channels
.
When other funds come back, they can only be forced to give up the project, resulting in the failure
.
When some developers have this situation, they will find other developers to take over, but if they can’t find other developers to take over in a short time, the probability of failure will be greatly improved
.
2
.
There are some illegal operations of developers
.
In order to make the real estate develop smoothly, some developers implement bribery or take the relationship and other illegal operations
.
Finally, they are found out by the relevant departments, and the leaders of the developers can only be forced to investigate
.
3
.
Developers in the process of real estate construction appeared shoddy situation, by the relevant departments investigation, can only be forced to stop work
.
There are millions of cases of uncompleted real estate, of which the ones just mentioned are also the most common in our life
.
The main reason why tower cranes are not willing to dismantle after they are rotten: you need to understand why tower cranes are not willing to dismantle
.
First, you need to understand the overall operation mechanism of tower cranes
.
Tower crane belongs to the construction company’s own machine
.
If the existing major projects need to be constructed, the construction company will choose to buy tower crane out of its own pocket
.
For general engineering construction companies, they are more willing to look for tower crane rental companies
.
For normal building construction, the monthly rent of tower crane is about 16000 yuan
.
For large tower crane, the rent is 60000-70000 yuan
.
After the uncompleted real estate, tower crane is not willing to withdraw: 1
.
The procedures are troublesome
.
The installation and demolition of tower crane is not as simple as imagined
.
It is a major source of danger
.
The relevant procedures are required during the installation and demolition
.
These procedures are very troublesome, and it basically takes a month to toss about
.
2
.
Even if there are such troublesome procedures for safety assessment, they are trying to dismantle those tower cranes for hundreds of thousands of people
.
However, in addition to the procedures just mentioned, there is also project acceptance, and the safety assessment report should be issued before the site acceptance
.
One of the safety evaluation reports is the exit of mechanical equipment
.
3
.
The cost of tower crane demolition includes the cost of anchor bolt embedded, labor cost, material cost, freight, crane cost, inspection cost, road cost and accommodation cost
.
All kinds of expenses are added together, and it basically costs 50000 yuan to dismantle a tower crane
.
Here’s another secret
.
99% of the investigations on the construction site can be judged as unqualified by the supervisor temporarily
.
The boss of each tower crane company has to register at least three tower crane companies
.
As for why, everyone knows
.
4
.
Developers encounter temporary difficulties, some developers are temporary, encountered cash flow difficulties, it does not mean that the project is bound to be uncompleted, and in the site shutdown, tower crane company is still in accordance with the normal charges, one more day will produce a day’s cost
.
Developers also don’t want their projects to be uncompleted
.
They will certainly prepare funds everywhere to ease the situation on the construction site
.
As a tower crane company, if they choose to dismantle the tower crane at this time, then the developers will really come back with financing, and they may not need their own tower crane
.
Naturally, we have a fluke mentality
.
We may stop work for three months or half a year
.
When the time comes, we can still get the money for the resumption of the project, and we can continue to cooperate
.
5
.
It was also mentioned at the beginning of cooperation with new development companies that some companies really can’t survive and find other companies to undertake
.
As for the length of time of the uncompleted real estate, there is really no definite factor
.
Some of them have taken over in a few months, and some have not taken over for more than 10 years
.
As long as there are developers or other companies taking over, they can be used as another bargaining chip
.
The emergence of a new company will also pay a certain fee according to the contract
.
Whether the fee will be paid in full or not depends on the negotiation between the two sides, but it’s better than not getting a cent and withdrawing
.
All the above information was told by my engineering friends
.
Before telling me, I was also very curious about this problem
.
Now after listening to him, all the doubts seem to have been solved
.
I am really a non professional answer, but I learned this kind of information from my friends
.
If there is something wrong, please comment and correct it below
.
My personal concern is: with the passage of time, there will be some dangerous things, such as machine aging, rust, metal fatigue and so on, which will eventually lead to falling from height
.
Maybe I’m worried that this problem is more redundant, even if the unfinished project is ordinary people can’t get in, but I’m not afraid of just ten thousand..
.