Closed construction time: 23 p.m
.
From July 25 to August 5, the bridge deck is constructed from south to North (to Haidian Island), and the traffic pressure into the island is high during peak hours
.
Recently, the main bridge of century bridge has implemented the expansion joint device replacement project
.
– 6 a.m
.
You’d better watch it.
.
From August 6 to August 17, the bridge deck is constructed from north to South (to the urban area), and the traffic pressure outside the island is high during peak hours
Haikou public security traffic police kindly remind that vehicles passing through the island should stagger the peak as far as possible, or bypass Renmin bridge, Heping Bridge and Haixin bridge as appropriate
.