During the construction, the project department planned in advance, focused on the theme of high-quality development, and took the “six to six creation ยท three type first-class Cup” Cup winning labor competition as the carrier to give full play to the leading and exemplary role of Party members and create a comprehensive and excellent pioneer team
.
On August 7, the project of batian Lot 3 was reported to be successful again, and the construction of subgrade filling test section was completed
.
The total length of the line is 21.6km, mainly including tunnels, bridges, culverts, interchanges, pavement works, traffic safety greening and housing construction works
.
The chainage range is K45 + 400 ~ k67 + 038
.
One belt, one road, the other is a new pattern for the new area of the West and the East
Batian Lot 3 project of No
.
The Party member commando team stood in the front line, kept a firm belief and the sense of urgency of seizing the day, focused on the site, strictly controlled the construction quality, and carried out all-round quality inspection and supervision on the mechanical combination, compaction machinery specification, loose paving thickness, rolling times, rolling speed, optimal moisture content and moisture content during rolling, so as to highlight the vanguard role with actions, Let the “red power” burst out the strongest power in the hot competition
.
It is of great significance to actively integrate into the “one belt” road, speed up the construction of new channels for the Western China Sea, deepen the two-way opening of land and sea, and promote the development of the western region
.
The subgrade test section is located in subgrade 94 and 96 areas of K47 + 200 ~ K47 + 420 section, with a length of 220m, subgrade filling of 265000 m3, subgrade filling width of 26m and maximum filling height of 27.2m
.
The completion of the subgrade filling test section has encouraged the morale of all participants in the project and laid a solid foundation for the high-quality and efficient completion of the follow-up construction of the project..
.
10 company is located in Tiandong County, Guangxi Zhuang Autonomous Region
.