Key points of safety and quality inspection: Supervision, construction and construction units must see!

Masonry method at wall corners, junctions and temporary breaks 32

.

3

.

38 Maintenance, etc

.

5

.

Reserved holes in masonry base course, crack prevention and seepage prevention at junctions of different substrates Implementation of prevention and control measures for common quality problems such as supporting measures for crack prevention and seepage prevention of block materials (VIII) others 35

.

Implementation of on-site supervision on key parts and key processes 22

.

External power protection 25

.

Material of steel pipe fasteners 23

.

Handling construction permit (commencement report)

.

Project quality problem handling and acceptance records 22

.

33, maintenance, etc

.

Formation and configuration of three-level power distribution 26

.

basic safety assurance conditions and physical inspection (I) safety management 1

.

Concrete cracking and leakage (VII) masonry works 29

.

Comprehensive treatment (III) scaffold 13 Preparation and approval of special scheme 14

.

4

.

Handling quality and safety supervision procedures

.

Ready mixed concrete, mortar 5

.

Safety technical disclosure 3 Establishment and implementation of enterprise and project safety inspection system 4

.

Retention of concrete formwork removal test blocks: retention quantity, identification, curing environment, etc

.

Safety management of subcontractors 6

.

Treatment of quality problems and quality accidents 15

.

Reinforcement processing parts: check whether the processing and binding quality meet the requirements 25 Reinforcement connection: check the connection mode and connection quality 26

.

Steel and welding for steel structure, connecting materials for solid parts 6

.

Setting of structural columns, ring beams and tie bars and other seismic structural measures 34

.

17

.

Construction site and material management 10

.

If there is anything wrong, please notify the deletion in time

.

Reinforcement variety, grade, specification and quantity: check against the construction drawing 23

.

Entrusting supervision according to regulations

.

Model room for prevention and control of common quality problems (wall Block) implementation of visual disclosure of system and construction technology 14

.

(IX) foundation pit 44, construction drawing design and review 45, construction according to drawings 46, foundation pit monitoring 47 Source: cost engineer this article is only for sharing and exchange, and does not participate in any commercial or profitable purpose

.

Safety protection in the frame 17

.

Foundation inspection slot 19

.

Self inspection and self correction of hidden dangers after the festival and verification of application for resumption of work 10

.

Line laying (VI) material hoist 29 Installation and disassembly scheme, filing and use registration 30, testing (including: validity period) and joint acceptance 31, foundation, attachment, etc

.

Foundation strength or bearing capacity inspection report, engineering pile bearing capacity and pile integrity inspection 8

.

43, maintenance, etc

.

Supervise and urge the construction unit to carry out self inspection, self correction and re inspection of hidden dangers after the festival 17

.

Approval and implementation of construction organization design or construction scheme 12

.

Site enclosure 8

.

Compressive strength test of concrete test block 9

.

Mortar joint thickness and mortar fullness 33

.

Implementation of special treatment of common quality problems (2) construction unit   9

.

Preparation and approval of special scheme 20 Whether the site erection is consistent with the scheme (including whether the actual material is basically consistent with the application of the scheme) 21

.

Issuance of quality problem notice and review of quality problem rectification results 23

.

16 Retention of concrete curing test blocks under the same conditions: retention quantity, identification, curing environment, inspection, etc

.

2

.

Review of materials, components and accessories Review before equipment incorporation or installation 22

.

Major modifications and changes to the original design, Re submission of construction drawing design documents 8

.

Whether the site erection is consistent with the scheme (including whether the actual material is basically consistent with the scheme application) 15

.

Performance of supervisors such as the chief supervision engineer on duty 18

.

Prefabricated components and prestressed concrete anchorage and fixture (II) related to structural safety and service performance 7

.

42, safety protection devices, etc

.

Bricks, blocks, infilled wall blocks Post embedded parts 4

.

Construction organization design and emergency plan 2

.

Mobilization acceptance of steel pipe fasteners and other materials (IV) formwork support 19

.

7

.

37, safety protection devices, etc

.

The position of stressed reinforcement and the thickness of concrete protective layer: check the spacing of stressed reinforcement on the working surface, the setting of crack proof reinforcement, reinforcement fixing measures and protective measures, the spacing of stirrups at nodes and the thickness of concrete protective layer (VI) concrete works 27 Appearance quality and dimensional deviation of concrete: check the appearance quality of concrete, such as honeycomb and pitted surface, and spot check the dimensional deviation of concrete components such as slab thickness; 28

.

On site office, accommodation and living facilities 11

.

Reinforcement and reinforcement welding, mechanical connection materials 3

.

Formation of two-level leakage protection 27

.

Safety education 5

.

Reinforcement welding Mechanical connection process test report 10, reinforcement welding, mechanical connection process report 11, steel structure connection (welding) quality inspection report 12, settlement observation record 13, others (III) standard curing room and test block retention management 14, standard curing room (box) setting: capacity, curing environment 15, concrete standard curing test block retention: retention quantity, identification, inspection, etc

.

Installation of prefabricated load-bearing members 36

.

Whether the supervision engineer adopts the forms of on-site inspection, patrol inspection and parallel inspection in accordance with the requirements of Engineering supervision specifications, Supervision of construction projects 24

.

6

.

Work with certificates for operators of special types of work (II) civilized construction 7

.

Stability of the frame 22

.

Scheme and erection of unloading platform 18

.

Construction load control: observation and inspection of floors and stacking conditions III

.

Basic quality assurance conditions and physical inspection (I) mobilization acceptance records and witness sampling and inspection records of raw materials such as raw materials, finished products, semi-finished products and components 1

.

(VII) construction elevator 34, installation and disassembly scheme, filing and use registration 35, testing (including: validity period) and joint acceptance 36, foundation, attachment, etc

.

Cement and admixtures, admixtures 2

.

Supervision of special treatment of common quality problems 2

.

Preparation and implementation of special treatment scheme for common quality problems 13

.

Organize and urge the construction and supervision units to carry out self inspection and self correction of hidden dangers after the festival

.

Implementation of witness sampling system 21

.

18

.

This article represents the author’s standpoint only, not the position of the official account, and all consequences are irrelevant to the official account.

.

1、 Behavior inspection of responsible subjects participating in construction on the construction site (1) construction unit   1

.

Stability of the frame 16

. Elephant Foot Ferrule

Closed management 9

.

Inspection lot, sub item Divisional (sub divisional) acceptance records (V) reinforcement works 21

.

Formation of TN-S system 28

.

Steel structure installation 37

.

32, safety protection devices, etc

.

Acceptance of concealed works 20

.

Review of construction organization design, special construction scheme and special scheme for common quality problems 20

.

Preparation and approval of supervision planning and supervision implementation rules 19

.

Review of construction drawing design documents

.

(IV) quality acceptance records and corresponding original records of image, inspection, measurement, detection, etc

.

Duty performance of personnel at key posts such as Project Manager 11

.

On site fire-fighting facilities and management 12

.

Removal of the frame (V) construction power 24

.

(VIII) tower crane 39, installation and disassembly scheme, filing and use registration 40, testing (including: validity period) and joint acceptance 41, foundation, attachment, etc

.

Inspection and acceptance of prevention and control measures for common quality problems such as engineering cracks and leakage (3) supervision unit   16

.

Reinforcement replacement: check whether the variety, grade or specification of reinforcement is changed and whether the design change document is handled 24

.

Masonry mortar strength and test block retention 30

.

Block quality 31

.

Organizing joint review of drawings, design disclosure and design change

.