Changshu construction general contracting transfer

This means that from January 1, 2021, when the construction unit submits the EIA documents of the construction project to the competent department of ecological environment for approval, the relevant materials for public participation declared by it need to comply with the provisions of the new public participation measures

.

Can you briefly introduce the revision process? A: the Ministry of ecology and environment attaches great importance to the revision of the measures

.

The inevitable result is the slow and stable development of fixed asset investment by implementing the “de productivity” of traditional industries, regulating real estate and strengthening environmental protection supervision.

.

Meanwhile, in the first half of 2021, the new construction area of China’s real estate reached 960 million square meters, with a growth rate of 11.8%

.

1、 General contracting qualification of Kashgar Construction: construction, municipal administration, electric power, electromechanical installation, highway, railway, port and waterway, water conservancy and hydropower, mining, metallurgy, chemical petroleum and communication

.

Q3: can you introduce the main contents of the revision? A: the Interim Measures in 2006 include 5 chapters and 40 articles

.

Further refine the ways of information disclosure into three ways: network, newspaper and posting announcements

.

The new public participation measures have a total of 34 articles and are no longer divided into chapters《 The measures for public participation mainly comprehensively revised the relevant provisions on public participation in environmental assessment of construction projects: 1

.

3、 While the overall development of the construction industry was stable, the growth rate of real estate investment accelerated and infrastructure investment decreased significantly

.

Q4: after the revision, how to strengthen the protection and supervision of public participation? A: in order to ensure the sufficiency and effectiveness of public participation, the new public participation measures have made the following provisions: first, the construction unit is required to prepare a separate statement on public participation and incorporate it into the acceptance elements of EIA approval, accept it and make it public at the same time, accept public supervision and reporting, and require the competent department of ecological environment to take public opinions seriously; Second, clarify the review obligations of the competent department of ecological environment, and require the competent department of ecological environment to review whether the format of public participation statement meets the requirements and whether the public participation procedures meet the provisions of the public participation measures; The third is to severely punish illegal and dishonest acts

.

What are the considerations behind this revision? A: in February 2006, the former State Environmental Protection Administration issued the Interim Measures for public participation in environmental impact assessment (HF [2006] No

.

At present, the housing construction market has a good development prospect and a stable supporting position

.

Since 2015, it has launched relevant preliminary research, discussion and collection of public reference materials for environmental assessment at home and abroad

.

According to the data, the growth rate of China’s real estate development investment increased steadily in the first half of 2015-2021

.

It can be seen that while the overall development of the construction industry is stable, the development of the real estate industry has accelerated and the development of infrastructure construction has slowed down

.

Table 3: investment in real estate development in the first half of 2014-2021 Table 4: new construction area of real estate houses in the first half of 2014-2021 in the first half of 2021, China realized a real estate development investment of 5.6 trillion yuan, a year-on-year increase of 9.7%, and the growth rate increased by 1.2 percentage points compared with the previous year (see Table 3)

. Plate Rebar Anchor

The growth rate of new construction area of real estate has maintained a high-speed development range of 10% – 15% for three consecutive years, and the development trend of the real estate industry is good

.

In the first half of 2021, infrastructure investment (excluding power, heat, gas and water production and supply) increased by 7.3% year-on-year, with a significant decline compared with the growth rate of 21.1% in the first half of 2021

.

28, hereinafter referred to as the Interim Measures), which made comprehensive and systematic provisions on public participation in environmental impact assessment for the first time

.

Under the background of economic structure adjustment and upgrading, China’s economic growth began to change to efficient development

.

6 questions and 6 answers《 The latest interpretation of the revised Measures for public participation in environmental impact assessment! The Ministry of ecology and environment recently issued the measures for public participation in environmental impact assessment (Order No

.

4 of the Ministry of ecology and environment), which will be implemented from January 1, 2021

.

In order to make all sectors of society more deeply understand the background, principles and contents of the revision of the public participation measures, the relevant person in charge of the environmental impact assessment department of the Ministry of ecology and environment answered the reporter’s questions

.

Q6: what should we pay attention to in the next step? A: the new public participation measures set a certain transition period and will be implemented from January 1, 2021

.

More clearly defined the main responsibilities of the construction unit, which is responsible for the authenticity and results of the implementation of the public participation organization; 2

.

It has organized local competent departments of ecological environment, construction units, environmental assessment institutions, environmental protection NGOs, environmental assessment and legal experts to hold special discussions for many times, adhering to the principle of “according to laws and regulations, problem orientation, highlighting key points The principle of “sufficient guarantee” was formed in March 2016

.

Table 5: investment in fixed assets in the first half of 2014-2021 from the investment in fixed assets in China in the first half of 2014-2021 (see Table 5), in the first half of 2021, China realized a fixed asset investment of 29.7 trillion yuan, a year-on-year increase of 6.0%, and the growth rate was 2.6 percentage points lower than that in the first half of 2021

.

Q2: the community is very concerned about the revision of the measures

.

Data show that from 2016 to the first half of 2021, the growth rate of housing construction area in China’s construction industry continued to rise

.

Tel: 13881983131 Qiusheng construction wechat: 13881983131 Jiangsu Qiusheng construction is an enterprise management consulting company approved and registered by Jiangsu Administration for Industry and commerce, specializing in new, additional, upgraded and extended construction engineering qualifications, handling work safety licenses, and providing construction enterprise talent services (first-class and second-class constructors, middle and senior engineers, technicians, etc.)

.

4、 The growth rate of fixed asset investment continues to decline, and the future situation of the construction market is becoming more and more severe

.

It can be seen that the growth of China’s fixed asset investment is gradually slowing down

.

In the first half of 2021, the construction area of housing in China’s construction industry reached 10.47 billion square meters, a year-on-year increase of 7.9% (see Table 2)

.

Data show that over the past five years, the growth rate of China’s fixed asset investment has continued to decline, from 17.3% in 2014 to 6.0%

.

Q5: what are the considerations of this revision in improving efficiency and optimizing the business environment? A: in order to further improve the efficiency of public participation and optimize the business environment, the following considerations are made in this revision: first, the restriction of 10 working days for the first information disclosure is cancelled and some participation procedures are optimized; Second, implement classified public participation, and reduce procedures for projects with few public opinions; Third, for projects located in the industrial park that meet certain conditions, the procedures and forms of public participation shall be appropriately simplified in the process of public participation

.

Q1: it has been 12 years since the promulgation and implementation of the Interim Measures for public participation in environmental impact assessment in 2006

.

Construction professional contracting qualification: Chaoyang environmental protection, decoration, electromechanical installation, building curtain wall, ancient architecture, urban and road lighting, electronics and intelligence, fire protection, waterproof, anti-corrosion and thermal insulation, steel structure, formwork scaffold, foundation, hoisting equipment installation, ready mixed concrete, bridge, tunnel, highway pavement, highway subgrade, highway transportation, railway electricity Railway track laying and girder erection, railway electrification, airport runway, civil aviation air traffic control, airport visual navigation aid, port and coast, channel, navigation buildings, port and navigation equipment installation and water traffic management, hydraulic metal structure fabrication and installation, water conservancy and hydropower electromechanical installation, river and lake regulation, power transmission and transformation, nuclear engineering, offshore oil and special engineering

.

In case of not fully soliciting public opinions, the competent department of ecological environment shall instruct the construction unit to solicit public opinions again and return the environmental impact report

.

In April 2021, the draft submitted for review was reviewed by the Ministerial Council of the Ministry of ecological environment, and issued for implementation

.