How to write the construction log and Safety log? Make it clear!

It is the proof of whether the equipment and facilities have been accepted and whether the safety and quality personnel have inspected the potential safety hazards on site( 3) The Construction Safety log is the notepad of the project and the most detailed first-hand data reflecting the construction safety production process

.

2

.

4

.

Click the blue word above to pay attention to Luban construction Luban construction – high-quality project, Luban process, high-quality node practice, wechat large-scale subscribed by 100000 engineering people

.

Safety log I

.

It can accurately, truly and subtly reflect the construction safety situation( 4) The Construction Safety log can serve as a document interface and can be used to trace things that are not in other documents( 5) As the construction data kept by the construction enterprise, the information recorded in the Construction Safety log that cannot be revealed in other engineering documents for various reasons may become the basis for judging the truth in the future

.

In the past, it was not difficult to find the Construction Safety log of some projects

.

Other inspection records must be specific and detailed, not general

.

The construction diary shall be recorded by the foreman of Building No

.

Type 2 work content 1

.

Mobilization records of facilities and supplies (quantity, place of origin, label, brand, number of certificates, etc.); 3

.

The inspection records are very detailed and can also replace the construction records

.

Failure to fill in on time and make materials for inspection

.

2、 How to record the construction log? First, understand the requirements for filling in the construction log: 1

.

Power, water and shutdown

.

Other inspections, such as civilized construction and site appearance management

.

Construction content and actual completion of the day

.

Only when we have an accurate understanding of the Construction Safety log, can we accurately grasp the compilation idea of the Construction Safety log

.

Promotion and use of special measures, construction methods, new technologies and new materials involved in construction

.

The names, axes and floors of divisional and subdivisional works shall be clearly written at the construction site

.

Technical and quality requirements, opinions and implementation of the construction unit and the supervision unit for the project construction

.

2、 How to write a safety log? First, it is necessary to know what should be recorded in the Safety log: the content of the Safety log can be divided into three categories: basic content, construction content and main notes

.

Quality inspection: quality inspection and treatment records of concrete pouring and forming, reinforcement installation and welding, brick masonry, formwork installation and removal, plastering, roof engineering, floor engineering and decoration engineering on that day; Concrete curing records, mortar and concrete admixture dosage; Causes and treatment methods of quality accidents, and effect verification after quality accident treatment

.

Equipment and facilities, construction electricity, “three treasures and four openings” protection 5

.

6

.

Mobilization and inspection of materials

.

2

.

Construction position

.

Positioning of Construction Safety log (1) Construction Safety log is a record

.

3

.

4

.

The construction safety diary has a very important position in the whole project archives“ The original meaning of “annals” refers to the written records

.

2

.

5

.

What happened on the day was not recorded in the log of the day, resulting in the phenomenon of post filling

.

In order to meet the inspection of the company or other superior departments, they shut themselves in the office and write “memoirs”

.

It mainly records the illegal operation, illegal command, safety problems and hidden dangers that have occurred on the construction site, and deals with the problems found( 2) The Construction Safety log is an evidence

.

Attendance and operation director

.

3

.

3

.

Category 4 inspection contents 1

.

It records the daily events related to construction safety in the construction process

.

What is construction log? Construction log is a real and comprehensive record of construction activities and site changes in construction organization management, construction technology and other relevant construction activities in the whole construction stage of construction project

.

Recording personnel usually do not fill in the Safety log in time

.

The main construction contents of the day must correspond to the construction parts

.

Timely, truthful and detailed records shall be made

.

Main contents of relevant meetings on the construction site

.

Safety inspection and treatment (correction) of potential safety hazards

.

Construction machinery failure and treatment

.

2

.

Category 3 inspection contents 1

.

3

.

Category 1 basic contents include the filling in of date, week and weather; Type 2 construction content includes the name of the sub item, the location of the layer, the working team, the number of workers and the progress of the construction; Class 3 main notes 1

.

The concealed contents, floors, axes, subdivisional works, acceptance personnel, acceptance conclusions, etc

.

4

.

The test block name, floor, axis and number of test block groups shall be indicated

.

It is not only a true portrayal of the daily safe construction of the project, but also the basis for the cause analysis of engineering construction safety accidents

.

The writing must be neat and clear, and it is best to write in imitation Song typeface or regular script

.

2

.

Welding records shall also be recorded in detail, including welding position, welding method (arc welding, electroslag pressure welding, overlapping double-sided welding, overlapping single-sided welding, etc.), welding current, welding rod (flux) brand and specification, welding personnel, welding quantity, inspection results, inspectors, etc

.

Click the blue word “Luban construction” under the title to pay attention, and we will provide you with valuable engineering reading

.

Fabrication of test block

.

6

.

Construction log and Safety log are one of the two basic works that builders often contact

.

Other special circumstances

.

Daily recording shall not be interrupted

.

The Construction Safety log is a material formed by daily written records from commencement to completion

.

The construction log should be filled in according to the unit project

.

Construction task disclosure, technical disclosure and safety technical disclosure

.

shall be indicated

.

Maintenance records shall be detailed, including maintenance parts, maintenance methods, maintenance times, maintenance personnel, maintenance results, etc

.

Construction preparation and implementation of measures in winter and rainy season

.

Patrol inspection (discovery of potential safety accidents, illegal command, illegal operation, etc.); 2

.

Source: in case of infringement, please contact China Railway 20th bureau to delete the introduction

.

Recording time: from commencement to completion acceptance

.

Second, avoid the following problems in the filling process: 1

. Fixing Socket Waved End

Category 5 other contents 1

.

2

.

3

.

5

.

Illegal operation, causes, treatment opinions and treatment methods of potential accidents (or near misses); 6

.

3

.

4

.

The average temperature can be recorded as XX ℃ – XX ℃, and the weather is recorded in the morning and afternoon respectively

.

Although they seem to be simple work, there are inspections on the builder’s sense of responsibility, professionalism and other aspects

.

Second, the contents to be recorded in the construction log shall be clear: the contents of the construction log can be divided into five categories: basic contents, work contents, inspection contents, inspection contents and other contents

.

Below, we summarize the standardized writing methods of construction log and Safety log, Teach you how to stand out in your daily work! Construction log 1

.

3

.

Attendance must be recorded by division of labor, and the total number of workers shall be recorded

.

The batch number, quantity, manufacturer and acceptance of incoming materials shall be indicated, and the inspection results after submission for inspection shall be supplemented later

.

Basic contents of category 1: date, week, weather and average temperature

.

Acceptance of concealed works

.

The start and end time of water and power cut must be recorded clearly, what work is being carried out during water and power cut, and whether losses are caused

.

Third, the details that should be paid attention to in the filling process: 1

.

2

.

Facility acceptance; 4

.

understanding of Safety log construction safety log is a continuous and detailed record of important production and technical activities in the whole construction process by full-time safety officers from the beginning to the completion of the project

.

In case of personnel change during the process, handover procedures shall be handled to maintain the continuity and integrity of the construction diary

.

Today is the day of June, but the filling of the Construction Safety log often stays in the middle of May, and even in March and April.

.

Design change, technical approval notice and implementation

.

Inspection opinions and decisions of relevant leaders, competent departments or various inspection teams on project construction technology, quality and safety

.