Great! Is it the scaffold used for the “largest and strongest pipe gallery” in China?

Huasheng Tiancheng strives to carry forward the spirit of craftsman, do a good job in every project, and make our due contribution to the country’s economic development! Beijing Huasheng Tiancheng, an integrated service provider of building formwork, integrates the production, scheme design, leasing and professional construction of turnbuckle scaffold

.

The scale of coiled scaffold is expected to exceed 170 billion yuan in 2027! Implement the national strategy, Huasheng Tiancheng participate in the construction of China (Zhejiang) pilot free trade zone! Scaffolding erection, demolition, acceptance of the 24 criteria, please put away! See how Huasheng Tiancheng scaffold escorts the construction of Hunan Meiyijia project, and the National Health Commission advocates celebrating the new year on the spot! How to prevent epidemic in construction site? Zanhe is watching here.

.

How large is the utility tunnel in the administrative office area of the sub center? Phase I pipe gallery project will provide municipal comprehensive pipeline access services such as power, communication, gas and water supply for the office buildings of municipal Party committee, municipal government, municipal people’s Congress, municipal people’s Political Consultative Conference, and various committees and bureaus within 1.4 square kilometers of the start-up area of the deputy central administrative office area

.

The project will include 18 kinds of underground pipelines in eight categories except rainwater and sewage pipelines, and cooperate with advanced operation and maintenance management system

.

The underground utility tunnel of Beijing Urban sub center is a three story utility tunnel with a diameter of 12 meters, which has become the largest utility tunnel in China

.

The comprehensive pipe gallery of the sub center intensifies the underground space to solve the influence of pipeline capacity increase, replacement and repeated excavation on the traffic

.

Comprehensive pipe gallery project construction in the start-up area of Beijing sub center administrative office area

.

It provides customers with a package of solutions for formwork engineering

.

Huasheng Tiancheng based on the actual project, with real service performance, to show the company’s heritage

.

Huasheng Tiancheng, as the leader of the coil scaffold engineering service, also performed well in the underground pipe gallery project! Next, let’s take a look at the general situation of Huasheng Tiancheng comprehensive pipe gallery project in the start-up area of Beijing deputy central administrative office area: project type: underground comprehensive pipe gallery supporting scaffold cooperation unit: Beijing Municipal Construction Group Co., Ltd

.

Improve the safety of infrastructure operation, solve the problem of overhead line network into the ground, beautify the city landscape, release the space of urban construction

.

Compared with the traditional support, the coil type scaffold has the advantages of simple structure, high bearing capacity, convenient erection and dismantling, which can greatly reduce the comprehensive cost and effectively ensure the safety and reliability of the structure, so it is undoubtedly the first choice for the construction of pipe gallery

.

The design and construction project adopts the full support of turnbuckle scaffold; the triangle frame and other accessories are widely used in yejiao; the turnbuckle frame model is unified, convenient and flexible, and the hanging span and other methods are fully used to set the channel, which greatly improves the speed of personnel passage and material transportation, and provides a strong guarantee for the completion on schedule

.

From the aspects of scheme design, construction progress, safety management, project acceptance and service follow-up, we should strictly control the details and attach importance to the construction of project quality

.

The construction of underground pipe gallery facilities has complex structure, large engineering span, narrow working face and limited space; cross operation, inconvenient material transportation and difficult construction

.

project volume: 180000 square meters, length: 1400 meters, 34 positions, a total of three underground floors; nine operation teams carry out the construction task at the same time

.

With a good reputation of safety, efficiency and zero accident, it has completed hundreds of national large-scale projects and gained high praise and trust from partners

.

After completion, it will become the most comprehensive underground utility tunnel in China

.

The comprehensive pipe gallery project involves 9 planned roads including Zhengtong West Road, Zhengtong North Street, Zhengtong East Road, Songliang Road, qinzheng West Street, qinzheng West Road, qinzheng East Street, qinzheng East Road and Guihua No.1 Road, with a total length of about 11.3 km

.

As a benchmark project to promote the construction of Beijing sub center with high starting point and high standard, the underground pipe gallery project of Beijing sub center puts forward strict requirements for the construction of pipe gallery facilities, and scaffolding is one of them

.