Windbreak wall construction @ where is the construction team of windbreak wall manufacturer?

The detailed size, curvature and opening rate of the wind and dust suppression plate shall be planned according to the actual situation of the storage yard.

  Construction of windbreak wall 13623181996      (3) Windbreak wall construction device: service life 15 ~ 20 years.

Windbreak wall construction 13623181996 @ where is a windbreak wall construction team? Windproof wall construction windproof wall construction windproof wall construction windproof wall construction windproof wall construction windproof wall construction windproof wall construction windproof wall construction    The construction planning and construction of windbreak wall are mainly divided into four parts:       (1) Construction of underground foundation of windbreak wall: the underground foundation shall be prefabricated concrete blocks or cast on site.

The steel support is selected for support.

     (4) Soil retaining brick wall for windbreak wall construction: in order to avoid coal slurry water overflow after rain and snow, 1.2-1.5m soil retaining brick wall can be set at the lower part of the windbreak wall.

PVC Chamfer

Operating ambient temperature: – 40 ℃ to + 80 ℃, the connection shall be fixed with screws and pressing plates.

The support mainly provides the “wind and dust suppression wall” with sufficient strength to resist the damage of strong wind.

https://lz1451468879.cn.china.cn/ 。.

     (2) Wind wall construction support structure: the project planning is based on the wind speed planning parameters.

The main body of the support is steel pipe, and the reinforced concrete pillar is selected as the support of “wind and dust suppression wall”.

Secondly, the overall strength is considered.